New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
Specifications RFQ 2010200077 Sidewalk Access
COE
>
PW
>
POS_PWM
>
Grants
>
2011 Audit Info
>
Specifications RFQ 2010200077 Sidewalk Access
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/9/2011 4:33:22 PM
Creation date
11/9/2011 11:19:07 AM
Metadata
Fields
Template:
COE_Contracts
COE_Contract_Number
2010-00410
COE_Contract_Document_Type
Contract
COE_Contract_Status
Active
COE_Contract_Organization
Sitework Construction
Department
Public Works
Contract_Administrator
Aanderud
Contract_Manager
Masoner
Document_Number
2010-00410
Account_Code
171-9335-6xxxx-955224
GJN
003293
External_View
No
Permanent_Retention
No
Supplemental fields
GL_Project_Number
955224
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
III. REQUIREMENTS / SPECIFICATIONS <br /> <br /> <br />The City of Eugene invites qualified contractors to provide bids for retrofit and construction of <br />sidewalk access ramps within the City’s right-of-way to meet American Disabilities Act (ADA) <br />standards. <br /> <br />Funding for the Project is being provided in whole or in part from proceeds of a Community <br />Development Block Grant (“CDBG”) from the U.S. Department of Housing and Urban <br />Development (“HUD”), and therefore will be subject to HUD regulations. <br /> <br />Bidders are required to comply with Executive Order 11246 related to Equal Employment <br />Opportunity. The successful Bidder will be required to use minority and female utilization goals <br />for the percentage of work hours performed in each craft on the Project. Female utilization goal <br />is 2.4 percent and minority utilization goal is 6.9 percent. <br /> <br /> <br />I. SCOPE OF WORK <br /> <br />The scope of work is to provide for, but not limited to the reconstruction and retrofitting concrete <br />sidewalk access ramps complying with the standards set in the current APWA, Oregon DOT <br />standards and City of Eugene standards and amendments meeting ADA requirements for access <br />ramps and sidewalks. It will also include minor alterations and ordinary repairs or construction of <br />roadways, sidewalk for structural defects, surface drainage and safety issues. The work to be <br />done by the Contractor may include one or more of the following activities; traffic control, <br />excavation, de-watering, erosion control, removal of spoils, backfill, surface restoration, grading <br />and sub grade and paving construction. <br /> <br />It shall be the Contractor’s full responsibility to have a complete understanding of the type of work <br />to be constructed at each location. The bid will be based on the Contractor’s site visit and <br />information proposed in this RFQ. The Contractor shall provide the City with a completed bid and <br />schedule for the ramps. The bids will include the base bid subject to the primary ramp work list <br />identified on the Standard Quote Form and individual prices for the alternate ramps. Bid prices <br />shall include all costs for construction of each ramp, including but not limited to: mobilization, traffic <br />control, de-watering, erosion control, concrete removal, excavation, base crushed rock, finished <br />concrete, asphalt removal and replacement where required, truncated domes, loam backfill, <br />reseeding with bark-o-mulch cover and site cleanup. <br /> <br />Upon acceptance and execution of the contract, the Contractor will be given a notice to proceed; <br />the Contractor will then coordinate with City staff in scheduling the work. <br /> <br />Once a notice to proceed has been issued and the work has begun, downtime due to equipment <br />failure or staffing problems shall be limited to no more than one work day on any site that <br />construction has begun. <br /> <br />The City will designate a staff member to act as the contact person between the City and the <br />Contractor. In addition to any coordination or other contact noted elsewhere in these <br />specifications, the contact designee will act as an inspector during the construction and repair <br />process. The inspector’s review of the job site will include but may not be limited to; safety <br />concerns, contract compliance, American Public Works Association (APWA) and City of Eugene <br />/ODOT Specifications and workmanship. <br /> <br />6 <br />PI RFQ 2010200077 Sidewalk Access Ramps <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.