New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
EPA Letter and backup
COE
>
PW
>
Admin
>
Finance
>
Operating
>
2011
>
EPA Letter and backup
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/18/2011 1:36:28 PM
Creation date
8/18/2011 1:35:50 PM
Metadata
Fields
Template:
PW_Operating
PW_Document_Type_ Operating
Correspondence
Fiscal_Year
2011
PW_Division
Engineering
GL_Fund
131
GL_ORG
9340
GL_Grant
621
GL_Project_Number
300316
External_View
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
199
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
ARTICLE 16 <br />CONTRACT ADMINISTRATION <br />CI <br />16.1. <br />ONDUCT OF NSPECTIONS <br />16.1 .1 I. <br /> Inspections or tests shall be performed so as not to unduly delay the <br />NSPECTORS <br />work of the contractor or subcontractor. No change of any provision of the <br />Specifications or the contract may be required by the inspector without written <br />authorization of the Purchasing Agent, unless otherwise specified in the Solicitation <br />Documents. The presence or absence of an inspector shall not relieve the contractor <br />or subcontractor from any requirement of the contract. <br />16.1 .2 PI. <br /> The location, timing and manner of inspections shall <br />ROCEDURE FOR NSPECTION <br />be a provided in the contract and under the provisions of subsection 15.4.4. <br />EC. <br />16.2 <br />NVIRONMENTAL ONDITIONS <br />16.2 .1 ECD. <br /> For purposes of this section, an <br />NVIRONMENTAL ONDITION EFINED <br />environmental condition is any physical condition of property that must be reported, <br />analyzed, removed or contained, or that requires other special handling under any law <br />(including, without limitation, statutes, ordinances rules or orders) relating to the <br />prevention of environmental pollution or the preservation of natural resources. <br />16.2 .2 RUL. <br /> If contractor is delayed or must undertake <br />ESPONSE TO NANTICIPATED AWS <br />additional work by reason of existing laws not cited in a Public Improvement contract <br />or due to the enactment of new or the amendment of existing laws relating to the <br />prevention of environmental pollution and the preservation of natural resources <br />occurring after the submission of the Offer under which the contract was made, the <br />city may: <br />(a) Terminate the contract; <br />(b) Complete the work itself; <br />(c) Use nonagency forces already under contract with the city; <br />(d) Require that the underlying property owner be responsible for cleanup; <br />(e) Solicit Offers for a new contractor to provide the necessary Services under the <br />competitive requirements of these regulations; or <br />(f) Issue the contractor a change order setting forth the additional work that must be <br />undertaken. <br />16.2 .3 RUEC. <br />ESPONSE TO NANTICIPATED NVIRONMENTAL ONDITIONS <br />16.2 .3 .1 Immediate Notice to City. <br /> If a contractor encounters an environmental <br />condition not referred to in the Solicitation Documents, not caused by the <br />contractor and not discoverable by a reasonable pre-Bid visual site inspection, <br />Article 16 Contract Administration Page 79 <br />Exhibit A to Administrative Order No. 44-08-06-F <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.