New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
Eugene Master Traffic Communications Plan
COE
>
PW
>
Admin
>
Finance
>
Operating
>
2011
>
Eugene Master Traffic Communications Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/12/2010 3:58:50 PM
Creation date
10/12/2010 1:46:04 PM
Metadata
Fields
Template:
PW_Operating
PW_Document_Type_ Operating
Reports
Fiscal_Year
2008
PW_Division
Maintenance
External_View
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
74
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Table 10. Proposed Communications Deployment Projects (continued) <br />Project <br />Description <br />Cost* <br />8E <br />Santa Clara Ave: River Rd to Fire Station <br />Install ISD fiber infrastructure in primarily existing conduit to Fire <br />$65,000 <br />#11 <br />Station #11. <br />9A <br />Hwy 99: Roosevelt Blvd to 6 Ave/ <br />Install fiber trunk line in existing conduit. (Have ODOT install conduit <br />$150,000 <br />Chambers St <br />as part of their upcoming planned project on Hwy 99.) <br />• Remove EOC devices at 2 traffic signals. <br />• Install ISD fiber connection to Bethel Public Safety Station. <br />9B <br />Hwy 99: Fairfield Ave to Roosevelt Blvd <br />Extend fiber trunk line in existing and new conduit on Hwy 99. <br />$100,000 <br />• Remove EOC devices at 2 traffic signals. <br />9C <br />Hwy 99: Prairie Rd to Fairfield Ave <br />Extend fiber trunk line in existing conduit on Hwy 99. <br />$145,000 <br />• Install field hub (middle Ethernet switch) at Hwy 99 /Barger Dr. <br />• Remove EOC devices at 3 traffic signals. <br />9D <br />1 s' Ave /Seneca Rd <br />Install wireless to 1 unserved traffic signal. <br />$15,000 <br />9E <br />Barger Dr: Primrose St to Hwy 99 <br />Install fiber in existing conduit and new conduit or aerial feed. <br />$165,000 <br />• Remove EOC devices at 4 traffic signals. <br />• Provides opportunity for IS fiber connection to Fire Station V. <br />9F <br />Barger Dr: Pedestrian Signal to Primrose St <br />• Install wireless to 2 unserved traffic signals. <br />$20,000 <br />9G <br />Echo Hollow Rd: Barger Dr to Royal Ave <br />• Install fiber in existing conduit or new conduit or aerial feed. Pick up 2 <br />$415,000 <br />unserved traffic signals. <br />• Remove EOC devices at 3 traffic signals. <br />• Provides opportunity for IS fiber connection to Bethel Library and Echo <br />Hollow Pool. <br />9H <br />Royal Ave: Beltline Rd to Echo Hollow Rd <br />• Install fiber in new conduit or aerial feed to future CCTV camera. <br />$120,000 <br />(Install at same time as new CCTV camera installation.) <br />91 <br />Royal Ave (Echo Hollow Rd to Bemtzen <br />• Install ISD fiber infrastructure to Petersen Barn and Fire Station #8. <br />$300,000 <br />Rd) & Bemtzen Rd (Petersen Barn to Fire <br />Station #8) <br />91 <br />Royal Ave: Terry St to Danebo Ave <br />• Install wireless to 1 unserved traffic signal. <br />$15,000 <br />9K <br />Prairie Rd & Cleadake Rd <br />• Extend fiber trunk line using existing aeri al feed. <br />$175,000 <br />9L <br />Hwy 99: Airport Rd to Clearlake Rd <br />• Extend fiber trunk line in new conduit or aerial feed to 1 unserved <br />$300,000 <br />traffic signal. <br />
The URL can be used to link to this page
Your browser does not support the video tag.