New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
Eugene Master Traffic Communications Plan
COE
>
PW
>
Admin
>
Finance
>
Operating
>
2011
>
Eugene Master Traffic Communications Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/12/2010 3:58:50 PM
Creation date
10/12/2010 1:46:04 PM
Metadata
Fields
Template:
PW_Operating
PW_Document_Type_ Operating
Reports
Fiscal_Year
2008
PW_Division
Maintenance
External_View
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
74
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Table 10. Proposed Communications Deployment Projects (continued) <br />Project costs include a 35- percent factor for the design, administration, and management of the project. All costs are in Year 2008 dollars. <br />Description <br />9M Hwy 99 or Maxwell Rd Fiber Ring <br />If ODOT installs fiber on Beltline Hwy between Hwy 99 and River Rd that <br />Completion <br />is available for sharing: <br />• Extend fiber in new conduit or aerial feed on Hwy 99 from Prairie Rd to <br />$270,000 <br />Beltline Hwy to complete fiber ring. <br />9N <br />If fiber is not available on Beltline Hwy: <br />• Install fiber in new conduit or aerial feed on Maxwell Rd from Prairie to <br />($150,000) <br />River Rd to complete fiber ring. <br />TOTAL • <br />iii <br />Contingency Project <br />C1 <br />Relocate Pearl Street Hub to RIS <br />If Public Works needs to vacate the Pearl St hub prior to implementing <br />$100,000 <br />any of the proposed communications projects: <br />• Move traffic signal modems from Pearl St hub to RIS. <br />• Copper Cables 79, 83, and K: Remove feed between 8`" Ave /Oak St <br />and Pearl St hub and pull cables in to RIS. <br />• Copper Cables 75, 76, and 78: Install punch down block at 8 1h <br />Ave /Park St and extend copper cable from punch down block into RIS. <br />• Copper Cables 31 and 32: Install punch down block at 8 1h Ave /Pearl St <br />and extend copper cable from punch down block to RIS. May require 1 <br />block of new conduit. <br />• Copper Cable 42: Install punch down block on Pearl St at City Hall and <br />extend copper cable from punch down block to RIS. <br />Project costs include a 35- percent factor for the design, administration, and management of the project. All costs are in Year 2008 dollars. <br />
The URL can be used to link to this page
Your browser does not support the video tag.