M M M M M M M M=11 M M M M111=11 IM = M111=11 <br />Table 10. Proposed Communications Deployment Projects (continued) <br />Project <br />Description I <br />Cost* <br />5F Bailey Hill Rd: 18" Ave to Warren St <br />Extend fiber trunk line in existing conduit and new conduit or aerial <br />$230,000 <br />feed to 1 unserved traffic signal. <br />• Remove EOC device at 1 traffic signal. <br />• Install ISD fiber infrastructure to Fire Station #10. <br />5G <br />Seneca Rd: 7" Ave to 11" Ave <br />Install fiber in new conduit or aerial feed to 1 unserved traffic signal. <br />$115,000 <br />5H <br />Chambers St: 18' Ave to 24"' Ave <br />Install wireless to 2 unserved traffic signals. <br />$20,000 <br />6A <br />Willamette St: RIS to 19'" Ave /Amazon <br />• Install fiber trunk line in existing conduit. (Share IS fiber infrastructure <br />$275,000 <br />Pkwy <br />from RIS to 10"' Ave/Willamette St.) <br />• Install EOC devices at traffic signals on existing Willamette St <br />interconnect system that are not located on new fiber trunk line. <br />6B <br />Amazon Pkwy: 19'" Ave to 30 Ave /Hilyard <br />• Extend fiber trunk line in existing conduit on Amazon Pkwy. <br />$135,000 <br />St <br />• Remove EOC devices at 3 traffic signals. <br />6C <br />Patterson St: 19'" Ave to YMCA <br />• Install twisted pair copper in new conduit or aerial feed to 1 unserved <br />$40,000 <br />traffic signal. <br />6D <br />28"' & 29'" Ave: Friendly St to Portland St <br />• Install wireless to 2 unserved traffic signals. <br />$20,000 <br />6E <br />29 Ave /Amazon Pkwy to Fire Station #5 <br />• Install ISD fiber infrastructure to Fire Station #5. <br />$145,000 <br />6F <br />Willamette St: Crest Dr to 46'" AveBrae <br />• Install twisted pair copper in existing conduit and new aerial feed to 1 <br />$75,000 <br />Bum Dr <br />unserved traffic signal. <br />7A <br />7`" Ave: Washington St to RIS & <br />• Install EOC devices at traffic signals on existing 7"' Ave interconnect <br />$80,000 <br />8' Ave/Washington St <br />system. <br />7B <br />Charnelton St/Olive St/Oak St <br />• Install EOC devices at traffic signals on existing Charnelton St/Olive <br />$55,000 <br />SUOak St interconnect system. <br />8A <br />Chambers St: 6`" Ave to Roosevelt Hub <br />• Install fiber trunk line in existing conduit. <br />$115,000 <br />• Install hub equipment (central Ethernet switch) at Roosevelt Public <br />Works facility. <br />813 <br />River Rd: Roosevelt Hub to Hilliard Ln <br />• Install fiber trunk line in existing conduit. <br />$330,000 <br />• Install EOC devices at traffic signals on existing River Rd interconnect <br />system that are not located on new fiber trunk line. <br />8C <br />River Rd: Hilliard Ln to Irving Rd <br />• Extend fiber trunk line in existing conduit on River Rd. <br />$215,000 <br />• Remove EOC devices at 8 traffic signals. <br />• Provides opportunity for IS fiber connection to Fire Station #11. <br />8D <br />1•` AveNan Buren St <br />• Install wireless to 1 unserved traffic signal. <br />$15,000 <br />