New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
Eugene Master Traffic Communications Plan
COE
>
PW
>
Admin
>
Finance
>
Operating
>
2011
>
Eugene Master Traffic Communications Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/12/2010 3:58:50 PM
Creation date
10/12/2010 1:46:04 PM
Metadata
Fields
Template:
PW_Operating
PW_Document_Type_ Operating
Reports
Fiscal_Year
2008
PW_Division
Maintenance
External_View
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
74
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Table 10. Proposed Communications Deployment Projects (continued) <br /># <br />Project <br />Description <br />Cost* <br />2.1 <br />Game Farm Rd: Crescent Ave to Chad Dr <br />Install fiber in new conduit or aerial feed to 1 future traffic signal. <br />$125,000 <br />(Install at same time as new traffic signal installation.) <br />2K <br />Centennial Blvd: Coburg Rd to Skipworth <br />Install fiber in new conduit or aerial feed to future CCTV camera. <br />$175,000 <br />Juvenile Ln <br />(Install at same time as CCTV camera installation.) <br />• Remove EOC device at 1 traffic signal. <br />2L <br />Centennial Blvd: Skipworth Juvenile Ln to <br />Install twisted pair copper in new conduit or aerial feed to future <br />$165,000 <br />Kinsrow Ave <br />reversible lane management system. (Install at same time as new lane <br />management system.) <br />3A <br />11"' Ave: RIS to Franklin Blvd <br />Share ISD fiber infrastructure and install interfaces to the traffic <br />$90,000 <br />signals. <br />3B <br />Franklin Blvd: 11'" Ave to Walnut St <br />Extend fiber trunk line in existing conduit. <br />$140,000 <br />3C <br />Broadway: RIS to Hilyard St and <br />Install fiber trunk line in existing conduit, plus one block of new conduit. <br />$175,000 <br />Franklin Blvd: Hilyard St to 11' Ave <br />Install ISD fiber infrastructure to West University Public Safety Station. <br />4A <br />6"' Ave: Jefferson St to RIS <br />Install fiber trunk line in existing conduit. (Share IS fiber infrastructure <br />$235,000 <br />from RIS to 6 th Ave /High St.) <br />• Install EOC devices at traffic signals on existing 6" Ave interconnect <br />system that are not located on new fiber trunk line. <br />4B <br />6'" Ave: Garfield St to Jefferson St <br />• Extend fiber trunk line in existing conduit on 6"' Ave. <br />$145,000 <br />• Remove EOC devices at 6 traffic signals. <br />5A <br />11" Ave: Washington St to RIS <br />• Install fiber trunk line in existing conduit or aerial feed. (Share IS fiber <br />$265,000 <br />infrastructure from RIS to 10"' Ave/Willamette St.) <br />• Install EOC devices at traffic signals on existing 11"' Ave interconnect <br />system that are not located on new fiber trunk line. <br />5B <br />11' Ave: Chambers St to Washington St <br />• Extend fiber trunk line in existing conduit or aerial feed on 11"' Ave. <br />$115,000 <br />• Remove EOC devices at 4 traffic signals. <br />5C <br />Chambers St: 6'" Ave to 11`" Ave <br />• Install fiber trunk line in existing and new conduit. <br />$160,000 <br />5D <br />11"' Ave: Bailey Hill Rd to Chambers St <br />• Extend fiber trunk line in existing conduit on 11'" Ave. <br />$195,000 <br />• Remove EOC devices at 9 traffic signals. <br />5E <br />11"' Ave: Terry St to Bailey Hill Rd <br />Extend fiber trunk line in existing conduit on 11"' Ave. <br />$210,000 <br />• Remove EOC devices at 5 traffic signals. <br />_M M -M M M M MM MM M M M M M M M M M <br />
The URL can be used to link to this page
Your browser does not support the video tag.