New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
Eugene Master Traffic Communications Plan
COE
>
PW
>
Admin
>
Finance
>
Operating
>
2011
>
Eugene Master Traffic Communications Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/12/2010 3:58:50 PM
Creation date
10/12/2010 1:46:04 PM
Metadata
Fields
Template:
PW_Operating
PW_Document_Type_ Operating
Reports
Fiscal_Year
2008
PW_Division
Maintenance
External_View
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
74
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Ml M M IM M M M M M w M M M <br />Table 10. Proposed Communications Deployment Projects <br />M M M 111=11 M M <br />Project <br />Description <br />1A <br />Coburg Rd: RIS to 1 -105 <br />Install fiber trunk line in existing conduit. (Share ISD fiber infrastructure <br />$370,000 <br />from RIS to 6` Ave /High St.) <br />• Install EOC devices at traffic signals on existing Coburg Rd <br />interconnect system that are not located on new fiber trunk line. <br />• Install hub equipment (central Ethernet switch) at RIS. <br />• Install camera control server at RIS to support existing CCTV cameras. <br />113 <br />Coburg Rd: 1 -105 to Cal Young Rd <br />• Extend fiber trunk line in existing conduit on Coburg Rd. <br />$150,000 <br />• Remove EOC devices at 6 traffic signals. <br />1C <br />Coburg Rd: Cal Young Rd to Crescent Ave <br />• Extend fiber trunk line in existing conduit on Coburg Rd. <br />$200,000 <br />• Install field hub (middle Ethernet switch) at Coburg Rd /Cal Young Rd. <br />• Remove EOC devices at 5 traffic signals. <br />• Install ISD fiber connection from Coburg Rd trunk line to Sheldon <br />Library. <br />2A <br />Willakenzie Rd: Sheldon Community Center <br />• Install fiber in new conduit or aerial feed to 1 unserved traffic signal. <br />$215,000 <br />to Coburg Rd <br />• Install ISD fiber connection to Fire Station #6, which also houses the <br />Emergency Operations Center, and the Sheldon Community <br />Center /Pool. <br />2B <br />Cal Young Rd: Norkenzie Rd to Coburg Rd <br />• Install fiber in new conduit or aerial feed to 4 unserved traffic signals. <br />$375,000 <br />2C <br />Gilham Rd: Carmel Ave to Cal Young Rd <br />• Install fiber in new conduit or aerial feed to 1 unserved traffic signal. <br />$80,00(3 <br />2D <br />Willagillespie Rd: Valley River Dr to Cal <br />• Install fiber in new conduit or aerial feed to 3 unserved traffic signals. <br />$395,000 <br />Young Rd /Norkenzie Rd <br />2E <br />Delta Hwy Ped Overcrossing, Goodpasture <br />• Install fiber in existing conduit and new conduit or aerial feed to 2 <br />$185,000 <br />Island Rd, & Valley River Dr <br />unserved traffic signals. <br />2F <br />Crescent Ave: Gilham Rd to Coburg Rd <br />• Install fiber in new conduit or aerial feed to 1 unserved traffic signal. <br />$240,000 <br />2G <br />Green Acres Rd- Crescent Ave: Delta Hwy <br />• Install fiber in new conduit or aerial feed to 2 unserved traffic signals. <br />$325,000 <br />to Gilham Rd <br />2H <br />Goodpasture Island Rd (Kingsley Rd to <br />• Install fiber in new conduit or aerial feed to 4 unserved traffic signals. <br />$400,000 <br />Norkenzie Rd) & Norkenzie Rd <br />• Install ISD fiber connection to Fire Station #9. <br />(Good pasture Island Rd to Cal Young Rd) <br />21 <br />Coburg Rd: Crescent Ave to Game Farm <br />• Extend fiber trunk line in existing and new conduit on Coburg Rd and <br />$215,000 <br />Rd and Game Farm Rd: Coburg Rd to <br />Game Farm Rd. <br />Crescent Ave <br />
The URL can be used to link to this page
Your browser does not support the video tag.