In the event that trees are damaged when a City Arborist is not on-site, the <br />Contractor shall stop Work which may result in further damage to trees and make <br />a request for a City Arborist to the Inspector. All Work which may further damage <br />trees shall be stopped, at the Contractors expense, until a City Arborist can make <br />on-site mitigation recommendations and provide on-site Work if needed. In <br />addition, actual tree damage such as trunk scoring or broken limbs or damaged <br />roots inside the Critical Root Zone will be assessed according to the percentage <br />of loss of tree value per City of Eugene Code <br />Any tree within the project limits damaged by the Contractor during construction <br />shall be evaluated by a City Arborist. If that evaluation determines that the action <br />will cause death or substantial damage, the Contractor shall be required to pay <br />the City an amount sufficient to fund the planting and establishment by the City of <br />a tree of similar value. The value of the existing street tree shall be calculated <br />using the plant appraisal method established by the Council of Tree and <br />Landscape Appraisers. <br />00310.41 Removal Work <br />(ADD)' (f) Pavement Removal <br />Coordinate Pavement Removal operations to comply with Section 00224. <br />Pavement may be removed by cold .plane operations where full thickness of <br />existing pavement is to be removed, if approved by the Engineer. Where <br />pavement is removed by excavation, edges of excavation shall be sawcut or <br />wheelcut. <br />(ADD) , 00310.83 Pavement Removal <br />Pavement removal completed and accepted will be measured in place by the <br />square foot. The thickness of pavement removal varies from 4 inches to 7 inches <br />and shall be considered approximate only. No guarantee is made that the actual <br />thickness will be the same as the estimated thickness. _ <br />00310.92 Separate Unit Basis <br />(ADD) Pay Item Unit of Measurement <br />(g) HMAC Pavement Removal ....................:Square Foot <br />(ADD) Where pavement removal is indicated on the plans, all Work required to remove <br />and dispose of existing pavement as specified will be made at the Contract price <br />per square foot for the item "Pavement Removal". No extra payment will be <br />made if the pavement thickness removed varies from what is shown or specified. <br />Removal of aggregate base or subgrade in addition to pavement in order to <br />reach the specified pavement removal thickness shall be incidental. <br />For item (g) WMAC, will be paid for according to 00745.90. <br />(ADD). Sawcutting and wheelcutting shall be incidental to the item of Work. <br />Special Provisions - Job 9s 4637 and 4435 <br />