(ADD) Payment for the item "Temporary Work Zone Traffic Control, Complete" will be <br />made at the Contract lump sum amount. Payment will be payment in full for <br />furnishing, installing, moving, operating, maintaining, inspecting, and removing <br />materials and TCD (excluding temporary striping and City Provided Special <br />Information signs), and for furnishing all equipment, labor, and incidentals <br />necessary to complete the Work as specified. <br />Revisions to the provided TCP necessary to accommodate the Contractor's <br />operations or traffic conditions shall be incidental. <br />00225.91 Temporary Signing <br />(ADD) Pay Item Unit of Measurement <br />(c) City Provided Information Signs..... <br />Item (c) will be payment in full for City Provided Special Information Signs <br />installed complete and including removal, restoration and transportation to and <br />from the location of installation, as directed by the Engineer. Locations of City <br />Provided Special Information Signs are not shown on project plans and shall be. <br />located at the direction of the Engineer Signs shall be picked up and returned to <br />Public Works Engineering at 99 East Broadway. The City will provide the sign <br />only; the City will not. provide posts or other supports, hardware, or any other <br />appurtenant items or associated Work. <br />00225.93 Temporary Traffic Delineation - <br />(DELETE) Temporary Striping . Foot <br />(ADD) Temporary Striping Lump Sum <br />(ADD) Lump sum payment for "Temporary Striping" shall include payment for temporary <br />striping tape, painted pavement markings, reflective flexible overlay pavement <br />markers, legends, and their removal if necessary. <br />00225.96 Temporary Electrical Signs - <br />(DELETE) (a) Sequential Arrow Signs Each <br />(b) Portable Changeable Message Signs ....................Each <br />(ADD) (a) Sequential Arrow Signs Day <br />(b), Portable Changeable Message Signs ....................Day <br />For items (a) and (b) payment is for days when the item is in use, no payment will <br />be made for days the item is stored and not actively used on the project. <br />00290.40 Protection of Forests <br />(ADD) When it is anticipated that roots of trees may be encountered during construction <br />activities, notify the Inspector 24 hours in advance, so a City Arborist may be. <br />present during the construction operation. If tree roots are encountered Work <br />affecting the roots shall be stopped, at the Contractor's expense, until the City <br />Arborist can make mitigation recommendations or provide on-site Work. <br />Special Provisions - Job #'s 4637 and 4435 <br />