New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
GJN4586 Knife River 2010-00024
COE
>
PW
>
Admin
>
Finance
>
Capital
>
2010
>
GJN4586 Knife River 2010-00024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/19/2011 11:35:47 AM
Creation date
6/10/2010 11:21:46 AM
Metadata
Fields
Template:
PW_Capital
PW_Document_Type_Capital
Contracts
PW_Active
No
External_View
No
GJN
004586
GL_Project_Number
995384
COE_Contract_Number
2010-00024
Retention_Destruction_Date
8/11/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
00748.40 Excavation <br />(ADD) Construction equipment or vehicles shall not be operated or driven on the <br />exposed subgrade nor the aggregate base until geotextile fabric and the first lift <br />of aggregate base has been placed. <br />00748.43 Pavement <br />(ADD) Pavement Repairs ten feet long and longer shall not be top lift paved with the <br />Pavement Repair paving and shall be left two inches below the existing <br />pavement surface, unless otherwise directed by the Engineer. <br />00748.90 Payment <br />(ADD) Saw cutting shall be incidental. <br />00759.90 General <br />(ADD) Pay Item Unit of Measurement <br />(1) Concrete Curb and Gutter ................................Foot <br />(m) Truncated Dome Texturing .........................Square Foot <br />(ADD) Variable height curb used for construction of sidewalk access ramps will be paid <br />for by the square foot as "Concrete Walks". <br />(ADD) Payment for installation, maintenance, removal and cleanup of temporary <br />sidewalk access ramps is incidental. <br />00850.41 Projects With Striping Plans <br />(ADD) Request pavement marking layout, from the Inspector, a minimum of five (5) <br />Work days prior to planned pavement marking application. The Agency shall <br />have a minimum of three (3) Work days after completion of top lift paving to <br />layout pavement marking types and locations. <br />02320.10 Acceptance <br />(c) Mahufacturer's Documentation <br />(ADD) The Contractor shall provide a Level B Certification for the subgrade geotextile. <br />Special Provisions Job #4586 Page 11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.