00748.40 Excavation <br />(ADD) Construction equipment or vehicles shall not be operated or driven on the <br />exposed subgrade nor the aggregate base until geotextile fabric and the first lift <br />of aggregate base has been placed. <br />00748.43 Pavement <br />(ADD) Pavement Repairs ten feet long and longer shall not be top lift paved with the <br />Pavement Repair paving and shall be left two inches below the existing <br />pavement surface, unless otherwise directed by the Engineer. <br />00748.90 Payment <br />(ADD) Saw cutting shall be incidental. <br />00759.90 General <br />(ADD) Pay Item Unit of Measurement <br />(1) Concrete Curb and Gutter ................................Foot <br />(m) Truncated Dome Texturing .........................Square Foot <br />(ADD) Variable height curb used for construction of sidewalk access ramps will be paid <br />for by the square foot as "Concrete Walks". <br />(ADD) Payment for installation, maintenance, removal and cleanup of temporary <br />sidewalk access ramps is incidental. <br />00850.41 Projects With Striping Plans <br />(ADD) Request pavement marking layout, from the Inspector, a minimum of five (5) <br />Work days prior to planned pavement marking application. The Agency shall <br />have a minimum of three (3) Work days after completion of top lift paving to <br />layout pavement marking types and locations. <br />02320.10 Acceptance <br />(c) Mahufacturer's Documentation <br />(ADD) The Contractor shall provide a Level B Certification for the subgrade geotextile. <br />Special Provisions Job #4586 Page 11 <br />