EROSION PREVENTION AND CONSTRUCTION SITE MANAGEMENT <br />2010 ANNUAL PERMIT <br />FOR <br />City of Eugene Public Works, Engineering <br />Background: <br />City of Eugene Public Works Engineering (PWE) division administers numerous projects <br />designed to replace and repair public ways and facilities. These and all <br />construction projects undertaken within the City of Eugene urban growth <br />boundary must meet the Erosion Prevention and Construction Site Management <br />outcomes of R-6.645D. An Annual Erosion Prevention and Construction Site <br />Management Permit is issued in lieu of individual project permits. Projects vary in <br />size and location, but are generally approached in the same manner as outlined <br />below. <br />Erosion Prevention and Construction Site Management Practices <br />A Construction Site Management Plan (CSMP) will be attached or incorporated into the bid <br />documents. It will consist of this narrative language, a set of standard CSMP <br />notes and detail drawings of inlet protection. <br />Issuance of the annual erosion prevention permit does not relieve the permit holder and or the <br />contractor from all other permitting requirements. Prior to beginning construction <br />activities, all other necessary approvals shall be obtained. <br />Prior to any ground disturbance on any project site, identified erosion prevention measures must <br />be installed and verified by Erosion Prevention and/or Public Works Engineering <br />staff. <br />Construction shall conform to the City of Eugene Standard Specifications, as currently amended. <br />Wet Weather Season (October 15th to April 30th ) <br />During the designated Wet Weather Season, additional Best Management Practices (BMP'S) are <br />required to ensure that all outcomes are being met. Measures may include immediate clean up of <br />all sediment and debris from the public right of way, street sweeping, and coverage of all <br />exposed soil at the end of every work shift. <br />Permanent stabilization of all exposed soils during the wet weather period shall occur within 24 <br />hours of final grade. <br />.qnanial Pm%AQinnc Anh ftARAA Papa 19 <br />