New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
GJN4586 Knife River 2010-00024
COE
>
PW
>
Admin
>
Finance
>
Capital
>
2010
>
GJN4586 Knife River 2010-00024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/19/2011 11:35:47 AM
Creation date
6/10/2010 11:21:46 AM
Metadata
Fields
Template:
PW_Capital
PW_Document_Type_Capital
Contracts
PW_Active
No
External_View
No
GJN
004586
GL_Project_Number
995384
COE_Contract_Number
2010-00024
Retention_Destruction_Date
8/11/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Revisions to the provided TCP necessary to accommodate the Contractor's <br />operations or traffic conditions shall be incidental. <br />00225.91 Temporary Signing <br />(ADD) Pay Item <br />Unit of Measurement <br />(c) City Provided Special Information Signs ......:.........Each <br />Item (c) will be payment in full for City Provided Special Information Signs <br />installed complete and including removal, restoration and transportation to and <br />from the location of installation, as directed by the Engineer: <br />00225.93 Temporary Traffic Delineation - <br />(DELETE) Temporary Striping Foot <br />(ADD) Temporary Striping Lump Sum <br />(ADD) Lump sum payment for "Temporary Striping" shall include payment for temporary <br />striping, pavement markings, reflective flexible overlay pavement markers, <br />legends, and their removal if necessary. <br />00225.96 Temporary Electrical Signs - <br />(DELETE) <br />(ADD) <br />(b) Portable Changeable Message Signs ....................Each <br />(b) Portable Changeable Message Signs ....................Day <br />For item (b) payment is for days when the item is in use, no payment will be <br />made for days the item is stored and not actively used on the project. <br />00290.40 Protection of Forests <br />(ADD) Vacuum excavation or hand excavation shall be performed below the hard <br />surface for the sidewalk access ramp construction on the northeast side of <br />Harlow Road and Palomino Drive. A smooth bucket may be used to remove the <br />existing concrete and asphalt surfaces required for the ramp construction. No <br />mechanical bucket or shovel excavation shall be performed below the hard <br />surface at this location. After vacuum or hand excavation is completed the <br />contractor shall not place any material until the City Arborist has made root <br />mitigation recommendations. The Engineer will notify the Contractor of the <br />Arborists decision. If no roots issues are discovered during excavation the <br />Engineer will notify the contractor without contacting the City Arborist. <br />When it is anticipated that roots of trees may be encountered during construction <br />activities, notify the Inspector 24 hours in advance, so a City Arborist may be <br />present during the construction operation. If tree roots are encountered Work <br />affecting the roots shall be stopped, at the Contractor's expense, until the City <br />I^k 44AXZQr- 0--- a <br />
The URL can be used to link to this page
Your browser does not support the video tag.