New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
GJN4586 Knife River 2010-00024
COE
>
PW
>
Admin
>
Finance
>
Capital
>
2010
>
GJN4586 Knife River 2010-00024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/19/2011 11:35:47 AM
Creation date
6/10/2010 11:21:46 AM
Metadata
Fields
Template:
PW_Capital
PW_Document_Type_Capital
Contracts
PW_Active
No
External_View
No
GJN
004586
GL_Project_Number
995384
COE_Contract_Number
2010-00024
Retention_Destruction_Date
8/11/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
00180.41 Project Work Schedules <br />(ADD) A Type A schedule as detailed in the specifications is required on this Contract. <br />00180.50 Contract Time to Complete Work <br />(d) Recording Contract Time <br />(DELETE) The sentence, "Once Contract Time.has commenced, the assessment of <br />Contract Time will continue uninterrupted until the specified number of Days is <br />exhausted." <br />(ADD) Once Contract Time has commenced, the assessment of Contract Time will <br />continue uninterrupted until the specified number of Days is exhausted or the <br />completion date is reached, whichever occurs first, except for the following items <br />the Contractor's may perform in advance of the other contract work: <br />• construction of concrete curbs and gutters <br />• construction of concrete walks and ramps <br />• construction of other work to be performed in conjunction with the above <br />items, such as alteration of traffic signal equipment within walks and ramps. <br />If the Contractor elects to perform any of the above listed items in advance of <br />other contract work, contract Work Day counts will be suspended upon the <br />completion of the advance work, including clean-up, re-paving with HMAC or <br />WMAC any vertical drop-offs and removal of traffic control from the project site. <br />Work Day counts shall resume once contract work is restarted and continue <br />uninterrupted until the specified number of Days are exhausted or the completion <br />date is reached, whichever occurs first. <br />(ADD) -(h) Contract Time <br />Thirty (30) Work days will be allowed. <br />Work shall not begin prior to June 14, 2010. <br />Work shall be completed by July 30, 2010. <br />No weekend or holiday Work will be allowed. <br />00180.85 Failure to Complete on Time: Liquidated Damages <br />(b) Liquidated Damages <br />(ADD) When cold planed surfaces within the traveled way are not paved within the time <br />period after cold plane operations identified in the Standard Specifications in <br />Subsection 00620.43, "Maintenance Under Traffic", or these Special Provisions, <br />liquidated damages, in the amount of $400.00, shall be assessed for each Work <br />Day in excess of the specified time period. Liquidated damages assessed for <br />failure to pave cold planed surfaces within the traveled way after cold planing <br />within the specified time period shall be in addition to liquidated damages <br />assessed for failure to complete the contract on time. <br />Cnarin1'Prnvicinnc Anh IfARRF Pane 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.