SPECIAL PROVISIONS FOR <br />PAVEMENT BOND MEASURE ON HARLOW ROAD FROM 1-5 TO COBURG ROAD <br />JOB #4586 <br />All number references in these Special Provisions shall be understood to refer to the Sections <br />and subsections of the Standard Specifications and Supplemental Specifications bearing like <br />numbers and to Sections and subsections contained in these Special Provisions in their entirety. <br />CLASS OF WORK <br />00120.'15 <br />(ADD) <br />00150.50 <br />(ADD) <br />Examination of Work site and Solicitation Documents; Consideration of <br />Conditions to be Encountered <br />Inquiries regarding the plans, specifications, and contract documents shall be <br />made to: Doug Singer at 541-682-8460 <br />Cooperation with Utilities <br />(f) Utility Information: <br />This Project is located within the Oregon Utility Notification Center area which is <br />a Utilities notification system for notifying owners of Utilities about Work being <br />performed in the vicinity of their facilities. The Utilities notification system <br />telephone number is 1-800-332-2344. <br />Utility <br />1. EWEB Water/Steam <br />2. EWEB Electrical <br />3. Comcast <br />4. Qwest <br />5. Northwest Natural <br />00180.40 Limitations of Operations <br />Contact Person's <br />Name and Phone Number(s) <br />Rod Wade <br />Rich Deluna <br />Tom Henerty <br />Lenny D'Ambrosia <br />Bill Elder <br />541-341-1846 <br />541-341-8522 <br />cell 541-228-1884 <br />office 541-484-3605 <br />541-484-8952 <br />cell 503-931-3865 <br />(ADD) Where top lift paving will occur over areas of Pavement Repair or Pavement <br />Removal, top lift paving shall not be performed until at least one (1) Work day <br />after completion of the Pavement. Repair and Pavement Removal Work. <br />The following items of Work will be constructed in the following order: <br />1. Manhole adjustments <br />2. Permanent striping <br />3. Traffic loop detectors <br />Special Provisions Job #4586 Page 1 <br />