(ADD) Item 0) includes payment for all Work to furnish and install Junction Boxes, as <br />identified in the plans or directed by the Engineer, including connecting to new or <br />existing conduit, splices, and resurfacing. <br />01120.90 General - <br />(ADD) Repairs to existing irrigation systems including rerouting of lines, replacement <br />and relocation of heads, and system testing to verify repairs shall be paid for <br />under the lump sum item "Repair Irrigation System". <br />02320.10 Acceptance <br />(c) Manufacturer's Documentation <br />(ADD) The Contractor shall provide a Level B Certification for the subgrade geotextile. <br />Special Provisions Job #'s 4583, 4617 and 4655 Page 12 <br />