Costs submitted by the. Contractor for "Asphalt Cement in WMAC Per Ton <br />Of WMAC Complete", for any WMAC bid item, over Twenty-nine (29) dollars <br />per a ton will be considered unbalanced and the bid will be rejected. <br />00748.40 Excavation <br />(ADD) Construction equipment or vehicles shall not be operated or driven on the <br />exposed subgrade nor the aggregate base until geotextile fabric and the first lift <br />of aggregate base has been placed. <br />00748.90 Payment <br />(ADD) Saw cutting shall be incidental. <br />00759.90 General <br />(ADD) Pay Item <br />Unit of Measurement <br />(k) Concrete Curb and Gutter ................................Foot <br />(1) Concrete Wide Curb and Gutter Foot <br />(m) Truncated Dome Texturing .........................Square Foot <br />(ADD) Variable height curb used for construction of sidewalk access ramps_will be paid <br />for by the square foot as "Concrete Walks". <br />(ADD) Payment for installation, maintenance, removal and cleanup of temporary <br />sidewalk access ramps is incidental. <br />00850.41 Projects With Striping Plans <br />(ADD) Request pavement marking layout from the Inspector at least five (5) business <br />days prior to planned pavement marking application. The Agency shall have a <br />minimum of three (3) business days after completion of top lift paving to layout <br />pavement marking types and locations. <br />00990.90 General <br />(ADD) Pay Item <br />Unit of Measurement <br />(h) Conduit Under Hard Surfacing .............................Foot <br />(i) Loop Feeder Cable ..Foot <br /> <br />0) Junction Box, .................................................Each <br />(ADD) Item (h) includes payment for furnishing and installing conduit, regardless of size, <br />as identified in the plans, under hard surfacing, such as concrete walks and <br />asphalt concrete pavement. Resurfacing work is incidental to this item and shall <br />be in accordance with project plans and specifications, and the City of Eugene <br />Publication, "Utility and Right-of-Way Permits Construction Within and Use of the <br />Public Way". <br />(ADD) Item (i) includes payment for all Work to furnish and install loop feeder cable, as <br />identified in the plans or directed by the Engineer, in new or existing conduit and <br />junction boxes, including splices, connections to the controller, and tie wraps for <br />placement on aerial messenger cables. Removal and salvage of existing loop <br />feeder wire as identified in the plans is incidental. <br />Special Provisions Job #'s 4583, 4617 and 4655 Page 11 <br />