New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
GJN4617 4583 4644 Eugene Sand Contract
COE
>
PW
>
Admin
>
Finance
>
Capital
>
2010
>
GJN4617 4583 4644 Eugene Sand Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/19/2011 3:45:31 PM
Creation date
5/18/2010 11:00:12 AM
Metadata
Fields
Template:
PW_Capital
PW_Document_Type_Capital
Contracts
PW_Active
No
External_View
No
GJN
004583
GL_Project_Number
995354
COE_Contract_Number
2010-00020
Retention_Destruction_Date
10/17/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
70
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
_w T <br />EROSION PREVENTION AND CONSTRUCTION SITE MANAGEMENT <br />2010 ANNUAL PERMIT <br />FOR <br />City of Eugene Public Works, Engineering <br />Background: <br />City of Eugene Public Works Engineering (PWE) division administers numerous projects <br />designed to replace and repair public ways and facilities. These and all construction projects <br />undertaken within the City of Eugene urban growth boundary must meet the Erosion Prevention <br />and Construction Site Management outcomes of R-6.645D. An Annual Erosion Prevention and <br />Construction Site Management Permit is issued in lieu of individual project permits. Projects <br />vary in size and location, but axe generally approached in the same manner as outlined below. <br />Erosion Prevention and Construction Site Management Practices <br />A Construction. Site Management Plan (CSMP) will be attached or incorporated into the bid <br />documents. It will consist of this narrative language, a set of standard CSMP notes and detail <br />drawings of inlet protection. <br />Issuance of the annual erosion prevention permit does not relieve the permit holder and or the <br />contractor from all other permitting requirements. Prior to beginning construction activities, all <br />other necessary approvals shall be obtained. <br />Prior to any ground disturbance on any" project site, identified erosion prevention measures must <br />be installed and verified by Erosion Prevention and/or Public Works 'Engineering staff. <br />Construction shall conform to the City of Eugene Standard Specifications, as: currently amended. <br />Wet Weather Season (October 15th to April 30") <br />. <br />During the designated Wet Weather Season, additional Best Management Practices (BMP'S) are <br />required to ensure that all outcomes are being met. Measures may include immediate clean up of <br />all sediment and debris from the public right of way, street sweeping, and coverage of all <br />exposed soil at the end of every work shift. <br />Permanent stabilization of all exposed soils during the wet weather period shall occur within 24 <br />hours of final grade. <br />Special Provisions Job #'s 4583, 4617 and 4655 Page 13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.