In addition, in areas where surfacing is altered or removed from crosswalks or <br />sidewalks resurface the areas with asphalt concrete or concrete in <br />accordance to ADA standards each day if the areas are open to pedestrian or <br />bicycle traffic. <br />• The contractor shall provide five-(5) business days prior notification to Lane <br />Transit District (LTD) Operations office, 541-741-6199 for all activities which <br />will affect their operations. The contractor shall also notify LTD on a daily <br />basis of specific Work activities, location, and schedule. <br />The contractor shall provide five (5) business days prior notification to <br />Sanipac Dispatch office, (541) 736-3618 for all activities which will affect their <br />operations. Upon request the contractor shall also notify Sanipac on a daily <br />basis of specific Work activities, location, and schedule. <br />• The contractor shall provide five (5) business days prior notification to Royal <br />Refuse Dispatch office, (541) 688-5622 for all activities which will affect their <br />operations. Upon request the contractor shall also notify Royal Refuse on a <br />daily basis of specific Work activities, location, and schedule: <br />• The contractor shall provide five (5) business days prior notification to Lane <br />Apex Dispatch office, (541) 607-2042 for all activities which will affect their <br />operations. Upon request the contractor shall also notify Lane Apex on a <br />daily basis of specific Work activities, location, and schedule. <br />• The contractor shall provide five (5) business days prior notification to the <br />U.S. Postal Service (LISPS), (541) 341-3694 for all activities which will affect <br />their operations. Upon request the contractor shall also notify USPS on a <br />daily basis of specific Work activities, location, and schedule. <br />• For Hawkins Lane, one portable changeable message sign (PCMS) shall be <br />installed at each end of the work zone, with the exact locations to be <br />identified by the Engineer. PCMS installation setup shall be in accordance <br />with the latest version of the "Oregon Temporary Traffic Control Handbook". <br />Place arrow boards at each night work lane closure or lane shift per the latest <br />version of the "Oregon Temporary Traffic Control Handbook". Program and <br />change messages as directed. <br />• For Oakway Road, one portable changeable message sign (PCMS) shall be <br />installed at each end of the work zone, with the exact locations to be <br />identified by the Engineer. PCMS installation setup shall be in accordance <br />with the latest version of the "Oregon Temporary Traffic Control Handbook". <br />• Place arrow boards at each night work lane closure or lane shift per the latest <br />version of the "Oregon Temporary Traffic Control Handbook". Program and <br />change messages as directed. <br />• No ramp or sidewalk location shall be closed for more than four (4) Calendar <br />Days. <br />00225.02 General Requirements <br />(ADD) Request modifications to the operation of traffic signals in writing to the Engineer <br />(five) 5 business days in advance. <br />Special Provisions Job #'s 4583, 4617 and 4655. Page 4 <br />