New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
GJN4582 Eugene Sand Gravel
COE
>
PW
>
Admin
>
Finance
>
Capital
>
2010
>
GJN4582 Eugene Sand Gravel
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/19/2011 11:33:16 AM
Creation date
5/7/2010 10:24:56 AM
Metadata
Fields
Template:
PW_Capital
PW_Document_Type_Capital
Contracts
PW_Active
No
External_View
No
GJN
004582
GL_Project_Number
995344
COE_Contract_Number
2010-00019
Retention_Destruction_Date
8/12/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
SPECIFICATION FOR ADJUSTMENT OF EWEB WATER VALVE BOXES <br />1.0 GENERAL <br />1.01 SECTION INCLUDES <br />A. Water Valve Boxes <br />B. Valve Box Risers <br />1.02 REFERENCES <br />A. EWEB Standard WC5-4..1000-Typical Valve Box Installation <br />B. EWEB Standard WC5.4.1100 - Typical Valve Box Retrofit-Repaving/Rotomill <br />with Asphalt <br />C. EWEB Standard WC5-4.1200 - Typical Valve Box Retrofit Street <br />Rebuild/Street Cut <br />D. City of Eugene-Diamond Cut Sanitary Cleanout Standard RD362(A) <br />1.02.1 The Contractor shall make all arrangements with EWEB Water Distribution to obtain <br />all materials to complete the Work. <br />2.0 PRODUCTS <br />A. Valve Boxes - EWEB will supply to the contractor all valve boxes and lids <br />necessary to complete the Work. <br />B. Valve Box Risers - EWEB will supply to the contractor all valve box risers <br />necessary to complete the Work. <br />C. Valve Tiles Material - 8" PVC, ASTM 3034, SDR 35 <br />"3.0 EXECUTION <br />A. The contractor will pick up materials at EWEB's Operations yard, 500 E. 4th Ave. <br />Eugene, Oregon, as needed. <br />B. Install and or adjust EWEB valve boxes, risers and lids in a manner consistent <br />with the use of EWEB water valves, as shown in EWEB Standards WC5-4.1000, <br />WC5-4.1100, and WC5-4.1200 to the satisfaction of EWEB. <br />1. Center box over the operator nut on the water valve <br />2. Remove debris from the valve tile to allow unobstructed access to and <br />operation of the operator nut on the valve. <br />3. Set top of valve box or riser flush with the street surface. <br />C. Report any leakage from any water valve to EWEB at 484-3766, as soon as <br />possible. <br />D. Mark in blue paint the exact location of any valve that is temporarily covered in <br />the course of the project. The mark shall be a blue "V' inside a 12-inch diameter <br />circle at the location of the valve that was covered. <br />4.0 PAYMENT <br />Payment for raising, lowering, adjusting and/or replacing EWEB valve boxes shall be <br />payment in full for all Work required at each location, regardless of the number of <br />separate operations performed and shall be paid for under the bid item, "Adjusting <br />Boxes". <br />Special Specifications - Job #4582 Page 12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.