New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
GJN4582 Eugene Sand Gravel
COE
>
PW
>
Admin
>
Finance
>
Capital
>
2010
>
GJN4582 Eugene Sand Gravel
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/19/2011 11:33:16 AM
Creation date
5/7/2010 10:24:56 AM
Metadata
Fields
Template:
PW_Capital
PW_Document_Type_Capital
Contracts
PW_Active
No
External_View
No
GJN
004582
GL_Project_Number
995344
COE_Contract_Number
2010-00019
Retention_Destruction_Date
8/12/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Sediment Barriers <br />Inlet protection shall be installed prior to any construction Work beginning and maintained <br />during the entire project, as noted on the CSMP. <br />Sediment Removal <br />(1) Existing stormwater facilities shall be monitored during the contractor's construction <br />activities. The Contractor shall, when directed by the Engineer, remove any sedimentation / <br />debris, associated with their construction activities, that has been allowed to enter these existing <br />stormwater facilities. <br />(2)The Contractor shall remove any sedimentation / debris, associated with their construction <br />activities, that has accumulated in the sump, and lines of newly constructed stormwater facilities <br />connected to the City's stormwater system, by the end of the Work day if construction is <br />occurring during the wet season Work period ( October 15 - April 30 ) or when directed by the <br />engineer. <br />Saw Cutting Slurry <br />All waste generated from saw cutting shall be vacuumed immediately behind the saw cutting <br />operation, and disposed of as approved by the engineer. <br />Additional Best Management Practices. <br />1. Sweep all streets in Work area nightly after Working in area. <br />2. Patch all street cuts nightly. <br />3. Construction debris and garbage will be disposed of properly at the end of every Work <br />day. <br />4. Concrete Work will occur in a manner such that no concrete is allowed to enter the city <br />storm system, or natural resources. Concrete wash areas shall be constructed whenever <br />possible, method of containment shall be straw bales lined with visqueen. <br />Project Contacts: <br />City contacts for these projects shall be the project managers for the individual projects. <br />Additional Contacts: <br />David Starns Project Manager 541-682-8306 <br />Special Specifications - Job #4582 Page 11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.