FINISH <br />FUNC I BY <br />FINISH <br />VALVE BOX <br />1010 <br />'PVC LINER <br />0 <br />" CONCRETI <br />LEAVE NO <br />INSIDE PVC <br />ASPHALT <br />SURFACE <br />NOTES: <br />1. USE FOR STREET 'REBUILD WITH ASPHALT OR CONCRETE AND ANYTIME A STREET CUT IS <br />MADE AROUND VALVE TILE. <br />2. IDENTIFY VALVE LOCATION. <br />3. CUT A 3 FT BY 3 FT DIAMOND CUT IN ASPHALT (CORE DRIWNG IS NOT ALLOWED) AND <br />THEN REMOVE ALL MATERIAL TO DEPTH' OF VALVE BOX.. <br />4. INSTALL FOAM BLOCK IN VALVE TILE TO KEEP DEBRIS FROM FALLING INTO VALVE TILE. <br />5. REMOVE EXISTING VALVE BOX AND DISCARD. <br />6. REMOVE FOAM BLOCK. <br />7. IF EXISTING TILE IS 8" PVC; IT MAY' BE REUSED. <br />8. IF EXISTING TILE IS IV CONCRETE THEN DO ONE OF THE FOLLOWING: <br />A. REMOVE EXISTING 10" CONCRETE TILE AND REPLACE IT WITH 8" PVC PIPE, <br />CENTERED OVER VALVE NUT. <br />B. IF CONCRETE TILE IS CENTERED OVER VALVE NUT, INSTALL A NEW 8" PVC TILE <br />INSIDE EXISTING 10" VALVE TILE. FILL GAP BETWEEN EXISTING 10" PIPE AND <br />NEW 8" PVC PIPE WITH 3/4" MINUS GRAVEL. (WHEN CUTTING FINAL LIFT). <br />9. INSTALL NEW VALVE BOX AND LID TO FINISHED GRADE. <br />10. INSTALL ASPHALT AND CONCRETE TO FILL IN AREA WITHIN DIAMOND CUT ACCORDING TO <br />CITY OF EUGENE SANITARY CLEANOUT STANDARD Rn iF;9(A1_ <br />ASSEMBLY LIST <br />IIfAI <br />ASSEMBLY NO. <br />WA". <br />OESCRIP110N <br />1 <br />965-2180 <br />3' <br />8" PVC PIPE, ASTM 3034, SDR 35 <br />2 <br />910-4010 <br />1 <br />VALVE BOX' <br />TION SHOWN 15 FOR EWER USE ONLY AND IS NOT WARRANTED TO-BE- ACCURATE FOR UNINTENDED PURPOSES. <br />CHK APP SCALE: WS <br />DES I WADE I 1 <br />DWN I NLN <br />SPONSOR I r <br />DATE: 01/25/08 <br />WATER STANDARDS <br />CONSTRUCTION <br />TYPICAL VALVE BOX RETROFIT <br />STREET REBUILD/STREET CUT <br />EUGENE WATER & ELECTRIC BOARD- EUGENE, OREGON <br />REV DATE I BY I CHK I APP <br />DWG NO REV <br />WC5-4. ] 200 0 <br />VALVE BOX RETROFIT <br />EXISTING VALVE BOX CONFIGURATION <br />