New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
GJN4674 Eugene Sand 2010-00014
COE
>
PW
>
Admin
>
Finance
>
Capital
>
2010
>
GJN4674 Eugene Sand 2010-00014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/19/2011 12:51:21 PM
Creation date
3/12/2010 10:38:40 AM
Metadata
Fields
Template:
PW_Capital
PW_Document_Type_Capital
Contracts
PW_Active
No
External_View
No
GJN
004674
GL_Project_Number
905196
COE_Contract_Number
2010-00014
Retention_Destruction_Date
5/27/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
51
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
In the event that trees are damaged when a City Arborist is not on-site, the <br />Contractor shall stop Work which may result in further damage to trees and make <br />a request for a City Arborist to the Inspector. All Work which may further damage <br />trees shall be stopped until a City Arborist can make on-site mitigation <br />recommendations and provide on-site Work if needed. <br />00310.92 <br />Any tree within the project limits damaged by the Contractor due to negligence <br />shall be evaluated by a City Arborist. If that evaluation determines that the action <br />will cause death or substantial damage, the Contractor shall be required to pay <br />the City an amount sufficient to fund the planting and establishment by the City of <br />a tree of similar value. The value of the existing street tree shall be calculated <br />using the plant appraisal method established by the Council of Tree and <br />Landscape Appraisers. Tree damage such as trunk scoring or broken limbs or <br />damaged roots inside the Critical Root Zone will be assessed according to the <br />percentage of loss of tree value per City of Eugene Code <br />Separate Item Basis <br />(DELETE) Pay Item <br />Unit of Measurement <br />(a) Removal of Pipes .................................:.........:..Foot <br />(ADD) Pay Item <br />Unit of Measurement <br />(g) Removal of Catch Basins Each <br />00445.91 Payment <br />(ADD). Under "No separate of additional payment will be made for;" <br />• Aggregate Base <br />00470.19 Catch Basin Traps <br />(ADD) Catch basin traps shall be made of LDPE or HOPE and shall be "Compact Catch <br />Basin Elbows" by Zymark Inc., telephone (503) 872-9242, or an approved equal. <br />Catch basin traps shall be installed per manufacturer's specifications, and/or as <br />directed by the Engineer. The Contractor shall field verify the size of catch basin <br />storm drain pipes where catch basin traps are to be installed. <br />00470.80 General <br />(ADD) Catch basin traps shall be measured on a unit basis for each catch basin trap <br />installed and accepted.' <br />00470.90 Payment <br />(ADD) Pay Item <br />Unit of Measurement <br />(m) Catch Basin Trap ..................................Each <br />Special Provisions - Job #4674 Page 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.