New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
GJN4674 Eugene Sand 2010-00014
COE
>
PW
>
Admin
>
Finance
>
Capital
>
2010
>
GJN4674 Eugene Sand 2010-00014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/19/2011 12:51:21 PM
Creation date
3/12/2010 10:38:40 AM
Metadata
Fields
Template:
PW_Capital
PW_Document_Type_Capital
Contracts
PW_Active
No
External_View
No
GJN
004674
GL_Project_Number
905196
COE_Contract_Number
2010-00014
Retention_Destruction_Date
5/27/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
51
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
00490.43 Abandoning Pipes in Place <br />(DELETE) Entire Second Paragraph <br />(ADD) Fill abandoned pipes 10 inches or greater with controlled low=strength material <br />meeting the requirements of 00442. <br />00490.90 Payment <br />(DELETE) Pay Item Unit of Measurement <br />(g) Connection to Existing Structures Each <br />(ADD) Pay Item Unit of Measurement <br />(i) Plug Pipe, V., <br />Each <br />(j) Filling Abandoned Pipes .:........................................CUYD <br />(ADD) Payment for connection to existing structures is incidental. <br />(ADD) Under "No separate of additional payment will be made for:" <br />• Removal of Existing Pipes <br />• Connecting to existing pour and place structures with thickened walls <br />00495.80 Measurement <br />(DELETE) Entire First Paragraph <br />(ADD) The quantities of Trench Resurfacing will be measured on the unit basis per <br />00495.90. <br />00495.90 Payment <br />(DELETE) Entire First Paragraph <br />(ADD) Trench Resurfacing shall be paid for according to 00745.90; 00756.90, and <br />00759.90 as applicable. <br />00756.60 Protection of Concrete <br />(DELETE) Entire First Paragraph <br />(ADD) Protect the concrete from traffic or other detrimental loading using temporary <br />steel plates with cold mix asphalt or HMAC ramps during non-work hours until <br />the pavement is opened to traffic. <br />00756.90 Payment <br />(ADD) Pay Item Unit of Measurement <br />(c) Plain Concrete Pavement, Doweled, Impact Panel ...................Square Foot <br />Item (c) includes all work to remove and repair impact panel as shown or directed <br />including rebar doweling. <br />Special Provisions - Job #4674 Page 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.