New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
GJN4657 4664
COE
>
PW
>
Admin
>
Finance
>
Capital
>
2009
>
GJN4657 4664
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/19/2011 12:41:58 PM
Creation date
11/30/2009 3:25:01 PM
Metadata
Fields
Template:
PW_Capital
PW_Document_Type_Capital
Contracts
PW_Active
No
External_View
No
GJN
004657
GL_Project_Number
905074
COE_Contract_Number
2010-00221
Retention_Destruction_Date
8/3/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Formatting of Deliverables <br />Guidance for document formatting is found in the Price Agreement between Contractor and <br />Agency. Additional formatting requirements are included below: <br />• Contractor shall use company logos only for technical reports for Contractor-performed <br />studies. Agency documentation that Contractor produces shall contain Agency logos as <br />specified by Agency. <br />• Contractor shall embed all graphic files into, the body of the main document so that the <br />document can be printed from one file. <br />• Contractor shall submit all graphic files separately in jpg or :tif formats unless specified <br />differently by Agency. <br />• Contractor shall convert all products, reports and deliverables including field investigation <br />reports, data, site forms, photographs and mapping compiled and each and any individual <br />resource technical report/memorandum to Adobe pdf format. <br />• Each final electronic deliverable shall be provided in MS Office file formats (i.e., Word <br />documents for reports) as well as an Adobe@ pdf format in which all figures, tables, and <br />appendices have been inserted in the appropriate order for final presentation: <br />E. TASKS AND DELIVERABLES <br />Contractor shall perform any or all of the services and provide any or all of the deliverables from <br />the list below and as stipulated in. the SOW. Contractor represents and warrants that the Project <br />will be completed on time, within budget, and will meet Agency objectives. <br />Notwithstanding Agency approval for involving certain sub-Contractors with respect to <br />particular tasks within this SOW, Contractor shall be responsible for completing all tasks and <br />providing all deliverables required in a WOC unless specifically identified as an Agency <br />responsibility. <br />Tasj 1 12Koject Nl~Inaget~Aeilt <br />;TasJ: 1.1 Project Ac niqr r1ol <br />To ensure that project scope, budget, and schedule objectives are met, Contractor's Project <br />Manager shall provide: <br />• Quality control; <br />• Contract administration; <br />Scope management and budget tracking; - - - <br />• Coordination with Agency personnel; <br />• Monthly project progress reports that must include current status, unresolved issues, and <br />major accomplishments during the month; <br />• Management of labor and sub-contractor resources; <br />• Development and maintenance of a Project filing system; <br />• Project Narrative; and <br />• Meetings, as required, to successfully deliver the work of this SOW. <br />Ta 1'1 Deliverable <br />Archaeology Scope of Work -GJN 4657 & 4664 <br />
The URL can be used to link to this page
Your browser does not support the video tag.