New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
GJN4657 4664
COE
>
PW
>
Admin
>
Finance
>
Capital
>
2009
>
GJN4657 4664
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/19/2011 12:41:58 PM
Creation date
11/30/2009 3:25:01 PM
Metadata
Fields
Template:
PW_Capital
PW_Document_Type_Capital
Contracts
PW_Active
No
External_View
No
GJN
004657
GL_Project_Number
905074
COE_Contract_Number
2010-00221
Retention_Destruction_Date
8/3/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
C. GENERAL ASSUMPTIONS AND REQUIREMENTS APPLICABLE TO ALL TASKS AND. <br />CONTINGENCY- TASKS <br />• Agency will be responsible for establishing all appropriate Tribal coordination and contacts, <br />unless Contractor is specifically assigned that task in this SOW. <br />• Any and all contingency tasks shall require written approval by Agency before Contractor <br />commences work on the task. <br />• Contractor shall determine all federal, state, and local government requirements related to <br />performance of this SOW. These requirements may conflict at times and may affect project <br />tasks performed by others. Contractor shall continuously coordinate their work with others <br />throughout the project as required to ensure all permit requirements are met while avoiding <br />conflicts and overlapping work areas. <br />• Agency will be responsible for negotiation with regulatory agencies regarding project <br />requirements unless this task is specifically assigned in this SOW. <br />• Contractor shall continuously communicate with project leader and team members as <br />required to remain informed of changes affecting the work and shall be responsible for <br />informing Agency of issues having the potential to interrupt the conduct of work. <br />• Contractor will not re-create or reproduce required work that has been or will be adequately <br />completed by others. <br />Contractor shall schedule enough on-site time to perform the work as required for each task. <br />D. REVIEW, COMMENT AND DELIVERABLE SCHEDULE <br />• Contractor shall submit all documents to Agency in Draft and Final format in both hard and <br />electronic copies: <br />• Contractor shall coordinate with Agency staff to make necessary changes and shall revise <br />Draft as necessary to incorporate Agency review comments. Agency staff will provide <br />comments to Contractor within ten (10) working days. <br />• Contractor will incorporate comments within ten (10) working days from receipt of Agency <br />comments and return the Final to the Agency staff, unless additional time is required by <br />Agency for Tribal negotiations. <br />• The schedule for delivery is identified in each task as number of days from NTP. For <br />contingency tasks this means the number of days from the NTP issued for the respective <br />contingency task: ' <br />• Contractor shall provide to Agency one (1) electronic copy and one (1) hard copy' of any <br />drafts prepared pursuant to this SOW. <br />Contractor shall provide to Agency one (1) electronic copy and two (2) hard copies of all final <br />deliverables under this Scope unless additional copies are requested by Agency. Final plan <br />sheets shall have a wet-signed professional seal and be delivered in 11" x 17" Mylar format. If <br />approved by the Agency, field documentation photography may be provided in electronic <br />format only. <br />• Contractor will provide to Agency one (1) electronic copy and one (1) hard copy of all <br />research files, data files, field investigations, reports, products and deliverables compiled for <br />this Scope. <br />• At end of Project, Contractor shall submit to Agency a CD or other approved storage media <br />with all final deliverables produced throughout the project. Contractor shall also provide <br />specific interim deliverables produced throughout the project when requested by Agency. <br />Archaeology Scope of Work -GJN 4657 & 4664 <br />
The URL can be used to link to this page
Your browser does not support the video tag.