New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
GJN 4618 Heritage Research 2010-00206
COE
>
PW
>
Admin
>
Finance
>
Capital
>
2009
>
GJN 4618 Heritage Research 2010-00206
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/26/2014 3:02:37 PM
Creation date
8/11/2009 11:46:23 AM
Metadata
Fields
Template:
PW_Capital
PW_Document_Type_Capital
Contracts
PW_Active
Yes
External_View
No
GJN
004618
GL_Project_Number
995864
Identification_Number
2010050072
COE_Contract_Number
2010-00206
GL_Grant
667
Retention_Destruction_Date
12/10/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
~ Nc~ vvi~rk is pro}~osed outside of tfie c~zistin~ right-~~1-«~at~ and no additional rii;hi-of-~ti~a~r is <br /> nccd~~d fur this }~rojecl <br /> B. GENERAL CONTRACTOR REQUIREMENTS AND OUTLINE OF SOW TASKS <br /> ' Contractor shall prepare all documents based on standard guidance in the style and format of <br /> sample documents provided by the Oregon Department of Transportation and/or Agency <br /> (ftp://ftp.odot:state.or.us/techserv/Geo-Environmental/Environmental/) or based on the reporting <br /> standards and guidelines provided on the Oregon State Historic Preservation Office (SHPO) <br /> website. Contractor is the Professional of Record for the work, which shall be executed by <br /> Contractor's qualified archaeologist or other qualified professional: Contractor shall be responsible <br /> for determining applicable ODOT/SHPO practices and standards to be used in performing the <br /> work. Contractor shall be responsible for obtaining all necessary state and/or federal excavation <br /> permits, in accordance with ORS 390.235 and the Archaeological Resources Protection Act. <br /> Agency will not accept or compensate for unrequested reports or Contractor work that is <br /> <br /> i' submitted in other format styles and will return them to Contractor for revision in the correct <br /> format at Contractor''s expense. <br /> .Contractor's .Qualified Archaeologist shall coordinate with SHPO, as necessary,. regarding <br /> documents (research) and shall coordinate with Agency Archaeological Staff to make necessary <br /> changes to Final documents to ,satisfy SHPO and Agency requirements. Agency will transmit <br /> Final documents to regulators on Agency letterhead. <br /> Section 106 of the NHPA .must be followed when atransportation-related project involves a <br /> federal nexus (i.e., federal land, federal money, or when federal. permits'are required). Contractor <br /> shall consult with Agency Archeology staff for questions about whether a federal nexus .exists. <br /> These projects will. require an archaeological resources evaluation consisting of pedestrian <br /> surveys and/or sub-surface testing. State-funded projects and/or projects involving state/private <br /> lands also require an archaeological resources evaluation (pedestrian surveys and/or sub-surface <br /> testing) as dictated in ORS 358.653, 358.640, and 3'58.920. Furthermore, the Agency's policy is to <br /> follow the Section 106 process for all #ransportation projects. <br /> ODOT will provide the PA Memo for above ground historical resources. The Contractor is to <br /> provide services identified under this scope of work pertaining to below-ground archeological <br /> resources. The Contractor shall coordinate with an ODOT contact provided by the Agency <br /> prior to submitting the PA Memo. <br /> Agency twill transmit Final documents to regulators on Agency. letterhead. <br /> Agency will provide project descriptions, maps and agency contact personnel information to <br /> Contractor once the Notice to Proceed (NTP) date has been determined. <br /> This SOW is comprised of the following tasks: <br /> • <br /> Archaeology Scope of Work -GJN 4479 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.