Task 1 Pro'ecYMaria ement <br /> Task 2 Prepare Scoping, Archaeological Field Survey; Records Search <br /> and Baseline/Reconnaissance Re ort <br /> Task 3 Provide Pro rammatc A reement Memorandum to A enc <br /> Task 4 Pro'ect Close-Out <br /> i <br /> C. GENERAL ASSUMPTIONS AND REQUIREMENTS APPLICABLE TO ALL TASKS AND <br /> CONTINGENCY TASKS <br /> <br /> ~i <br /> • Agency will be responsible for establishing all appropriate Tribal coordination and contacts,. <br /> unless Contractor is specifically assigned that task in this SOW. <br /> • Any and all contingency tasks shall require written approval by Agency before Contractor <br /> .commences work' on the task. <br /> • Contractor shall determine all federal, state, and local government requirements related to <br /> performance of this SOW. These requirements may conflict at times and may affect project <br /> tasks performed by others. Contractor shall continuously coordinate their work with others <br /> ' throughout the project as required to ensure all permit requirements are met while avoiding <br /> ~ conflicts and overlapping work areas. <br /> • " Agency will be responsible for negotiation with regulatory agencies regarding project <br /> requirements unless this task is specifically assigned in this SOW. <br /> • Contractor shall continuously communicate with project leader and team members as <br /> required to remain informed of changes affecting the work and shall, be responsible for <br /> informing Agency of issues having the potential to interrupt the conduct of work. <br /> • Contractor will not re-create or reproduce required work that has been or will be adequately - <br /> completed by others. <br /> Contractor shall schedule enough on-site time to perform the work-as required for each task. <br /> D. REVIEW, COMMENT AND DELIVERABLE SCHEDULE <br /> • Contractor shall submit all documents to Agency in Draft and Final format in both hard and <br /> electronic copies. <br /> • Contractor shall coordinate with Agency staff to make necessary changes and shall revise <br /> Draft as necessary to incorporate- Agency review comments. Agency staff .will provide <br /> comments to Contractor within ten (10) working days. <br /> • Contractor will incorporate comments within ten (10) working days from receipt of Agency <br /> comments and return the Final to the Agency staff, unless additional time is required by <br /> Agency for Tribal negptiations. <br /> • The schedule for delivery is identified in each task as number of days from NTP. For <br /> contingency tasks this means the number of days from the NTP issued for the respective <br /> contingency task. <br /> • Contractor shall provide to Agency one (1) electronic copy and one (1) hard. copy of any <br /> drafts prepared pursuant to this SOW. <br /> • Contractor shall provide to Agency one (1) electronic copy and two (2) hard copies of all final <br /> deliverables under this Scope unless additional copies are requested by Agency. Final plan <br /> sheets shall have awet-signed professional seal and be delivered in 11" x 17" Mylar format: If <br /> approved by the Agency, field documentation photography ,may be provided in electronic <br /> . format only. <br /> Archaeology Scope of Work -GJN 4479 <br /> _ . <br /> <br />