New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
GJN4524 Babb Const Contract 2010-00002
COE
>
PW
>
Admin
>
Finance
>
Capital
>
2009
>
GJN4524 Babb Const Contract 2010-00002
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/26/2014 2:25:21 PM
Creation date
7/27/2009 12:07:52 PM
Metadata
Fields
Template:
PW_Capital
PW_Document_Type_Capital
Contracts
PW_Active
Yes
External_View
No
GJN
004524
GL_Project_Number
985216
Identification_Number
2010050056
COE_Contract_Number
2010-00002
Retention_Destruction_Date
12/12/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
84
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
~ ~ <br /> • ~ <br /> <br /> i <br /> ROOFER (Continued) TENDERS TO MASON TRADES Brick and <br /> Stonemason, Mortar Mixer, Hod Carrier) <br /> Add $3.00 to basic hourly rate for employees (Continued) <br /> working with irritable bituminous materials <br /> Add to base rate an amount equal to that received for <br /> SHEET METAL WORKER safety belt requirements or other unusual job <br /> conditions by the mechanic this worker is tending. <br /> Area 1 3 .2 <br /> 3 7 16.05 <br /> TENDER TO PLASTERER AND STUCCO <br /> Add $1.00 to base rate for work performed on any MASON <br /> swinging platform, swinging chair or swinging 23.62 11.00 <br /> ladder. <br /> TILE SETTER/TERRAZZO WORKER: Hard Tile <br /> Add $1.00 to base rate for work with lead or Setter 26.53 12.60 <br /> installing material in a plant that uses lead in any <br /> form to manufacture a product (excluding (This trade is tended by "Tile, Terrazzo, & Marble <br /> soldering). Finisher") <br /> Add $1.00 to base rate for work performed in a TILE TERRAZZO AND MARBLE FINISHER <br /> confined space as defined by OSHA. <br /> TILE, TERRAZZO FINISHER <br /> Area 3 29.71 15.00 20.21 9.20 <br /> Add $1.00 to base rate for work where it is BRICK AND MARBLE FINISHER <br /> necessary to wear a chemically activated face 20.21 9.30 <br /> mask. <br /> Add $1.00 to base rate if safety belt required by State <br /> Area 4 29.00 14.53 safety regulations.. <br /> Area 5 28.13 15.30 Add $1.00 to base rate if work involves epoxy, <br /> furnane, alkor acetylene black grouting or waterproof <br /> Area 1 Area 1 (Cont.) Area 5 membrane. <br /> Benton Washington Coos <br /> Clackamas Wheeler Curry TRUCK DRIVER <br /> Clatsop <br /> Columbia Area 3 Group 1 26.40 11.91 <br /> Gilliam Morrow Group 2 26.52 11.91 <br /> Grant Umatilla Group 3 26.65 11.91 <br /> Lincoln Group 4 26.91 .11.91 <br /> Linn Area 4 Group 5 27.13 11.91 <br /> Multnomah Douglas Group 6 27.29 11.91 <br /> Tillamook Lane Group 7 27.49 11.91 <br /> SOFT FLOOR LAYER 25.58 10.85 <br /> (Zone Pay in addition to Basic Hourly Rate and <br /> SPRINKLER FITTER 32.15 16.55 Fringe.) <br /> TENDERS TO MASON TRADES Brick and For the Following Cities: <br /> Stonemason, Mortar Mixer, Hod Carrier) <br /> Albany Grants Pass Ontario <br /> 25.14 11.00 Astoria Hermiston Oregon City <br /> Baker Hood River Pendleton <br /> Add $0.50 to base rate for refractory work. Bend HIamath Falls Portland <br /> Bingen LaCrrande Port Orford <br /> Brookings Lakeview Reedsport <br /> Burns Longview Roseburg <br /> • 11' ~ ~ 1 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.