New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
GJN4524 Babb Const Contract 2010-00002
COE
>
PW
>
Admin
>
Finance
>
Capital
>
2009
>
GJN4524 Babb Const Contract 2010-00002
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/26/2014 2:25:21 PM
Creation date
7/27/2009 12:07:52 PM
Metadata
Fields
Template:
PW_Capital
PW_Document_Type_Capital
Contracts
PW_Active
Yes
External_View
No
GJN
004524
GL_Project_Number
985216
Identification_Number
2010050056
COE_Contract_Number
2010-00002
Retention_Destruction_Date
12/12/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
84
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
~ ~ ~ ~ ~ ~ ~ ~ <br /> ~ ~ i ' ~ i <br /> ~ ~ <br /> ~ ~ ~ <br /> TRUCK DRIVER (Continued) <br /> Coos Bay Madras Salem <br /> Corvallis Medford The Dalles <br /> Eugene McMinnville Tillamook <br /> Goldendale Newport Vancouver <br /> Zone differential for Truck Drivers <br /> (Add to Zone A rate) <br /> Zone B .65 <br /> Zone C 1.15 <br /> Zone D 1.70 <br /> Zone E 2.75 <br /> Zone A: Projects within 30 miles of the cities listed <br /> above <br /> Zone B: More than 30 miles but less than 40 miles. <br /> Zone C: More than 40 miles but less than 50 miles. <br /> Zone D: More than 50 miles but less than 80 miles. <br /> Zone E: More than 80 miles. <br /> Note: All job or project locations shall be computed <br /> (determined) on the basis of road miles and in the <br /> following manner. A mileage measurement will start at <br /> the entrance to the respective city hall, facing the project <br /> (if possible), and shall proceed by the normal route <br /> shortest time-best road to the eo ra hical center on <br /> ( ) g g <br /> p <br /> <br /> the highway, railroad, and street construction projects <br /> (end of measurement).On all other project contracts, the <br /> geographical center where the major portion of the <br /> construction is located, shall be considered the center of <br /> <br /> the project (end measurement). <br /> _ _ <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.