~ ~ <br /> ~ ~ . <br /> POWER EQUIPMENT OPERATOR ROOFER (Continued) <br /> (Continued) Area 1 * <br /> (B) All jobs or projects located in the area outside Clackamas Gilliam Multnomah Washington <br /> the identified boundary above, but less than 50 Clatsop Grant Tillamook Wheeler <br /> miles from the Portland City Hall shall receive Columbia <br /> Zone 2 pay for all classifications. <br /> *On all jobs on which coal tar pitch is the basic roofing <br /> (C) All jobs or projects located more than 50 miles material or ,where the old roof being removed is <br /> from the Portland City Hall, but outside the composed of coal tar based material, a rate, of pay ten <br /> o <br /> identified border above, shall receive Zone 3 percent (10 greater than the basic rate. of pay shall <br /> <br /> I <br /> be aid for all work erformed. <br /> pay for all classifications. p p <br /> For the Following Cties• *All employees engaged in removing fiberglass <br /> insulation shall receive a rate of pay ten percent (10%) <br /> Albany; Bend; Coos Bay; Eugene; Grants Pass; greater than the employee's basic rate of pay. <br /> Klamath Falls; Medford and Roseburg: Area 2** L.) & (b) <br /> (A) All jobs, or projects located within 30 miles of <br /> the respective city hall of the above mentioned Roofer 21.07 9.40 <br /> cities shall receive Zone 1 pay for all Benton Marion <br /> classifications. Lincoln Polk <br /> Linn Yamhill <br /> (B) All jobs or projects located more than 30 miles <br /> and less than 50 miles from the respective city Add $2.00 to basic hourly rate for application, <br /> hall of the above mentioned cities shall receive spudding and cutting or removal of coal tar products. <br /> Zone 2 for all classifications. <br /> Add $0.50 per hour- to base hourly rate for <br /> (C) All jobs or projects located more than 50 miles application, spudding and cutting or removal of <br /> from the res ective cit hall of the above <br /> p Y fiberglass insulation. <br /> mentioned cities shall receive Zone 3 pay for <br /> all classifications. Area 4*** <br /> Note: All job or project locations shall be computed Roofer 22.65 8.70 <br /> (determined) on the basis of road miles and in the <br /> following.. manner. A mileage measurement will start at Umatilla <br /> the entrance to the respective city hall, facing the project <br /> (if possible), and shall proceed by the normal route ***Add $2.00 to basic hourly rate for employees <br /> (shortest time-best road) to the geographical center on ~,orking with irritable bituminous materials. <br /> the highway, railroad, and street construction projects <br /> (end of measurement). On all other project contracts, the ***Add $2.00 to basic hourly rate for employees <br /> geographical center where the major portion of the <br /> construction is located, shall be considered the center of working with "Densdeck" roofing board. <br /> the project (end measurement). <br /> ***Add $2.00 to basic hourly rate for employees <br /> ROOFER removing fiberglass insulation. <br /> Area 1* Area 5**** <br /> Roofer 26.65 8.63 Roofer 22.56 8.75 <br /> Handling coal tar pitch 29.32 8.63 <br /> Remove fiberglass insulation 29.32 8.63 Morrow <br /> <br />