New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
GJN4524 Babb Const Contract 2010-00002
COE
>
PW
>
Admin
>
Finance
>
Capital
>
2009
>
GJN4524 Babb Const Contract 2010-00002
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/26/2014 2:25:21 PM
Creation date
7/27/2009 12:07:52 PM
Metadata
Fields
Template:
PW_Capital
PW_Document_Type_Capital
Contracts
PW_Active
Yes
External_View
No
GJN
004524
GL_Project_Number
985216
Identification_Number
2010050056
COE_Contract_Number
2010-00002
Retention_Destruction_Date
12/12/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
84
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
~ ~ i ' ~ i <br /> ~ , ~ ~ <br /> r . ~ . <br /> <br /> .PAINTER & DRYWALL TAPER PLUMBER/PIPEFITTER/STEAMFITTER <br /> (Continued) (Continued) <br /> Drywall Taper 31.86 11.28. Area 1 Area 2 Area 3 <br /> PLASTERER AND STUCCO MASON Baker Grant (b) All Remaining <br /> (This trade is tended by "Tenders to Plasterers") Harney (a) Morrow Counties <br /> Malheur Umatilla <br /> Nozzleman 29.46 11.61 Union <br /> Swinging Scaffold 30.46 11.61 Wallowa <br /> All Other Work 28.46 11.61 <br /> (a) Except Northwest Portion <br /> PLUMSER/PIPEFITTER/STEAMFITTER (b) Except Southwest Portion <br /> Area 1 26.70 10.65 POWER EQUIPMENT OPERATOR <br /> Add $2.21 per hour to basic hourly rate if it is Zone 1 (Base Rate) <br /> possible for worker to fall 30 ft. or more, or if <br /> required to wear a fresh-air mask or similar Group 1 36.22 10.90 <br /> equipment for 2 hours or more. Group lA 38.03 10.90 <br /> Group 1B 39.84 10.90 <br /> Zone Differential for Area 1 Group 2 34.65 10.90 <br /> Plumber/Pipefitter/Steamfitter/ Group 3 33.69 10.90 <br /> (Add to Base Rate) Group 4 32.78 10.90 <br /> Group 5 31.71 10.90 <br /> Zone 1 2.50 per hour Group 6 28.82 10.90 <br /> Zone 2 3.50 per hour <br /> Zone 3 5.00 per hour Note: A Hazardous Waste Removal Differential must <br /> be added to the base rate if work is performed inside <br /> Zone mileage based on road miles: the boundary of a Federally Designated Waste Site. <br /> For information on this differential, call the Prevailing <br /> Zone l: Forty (40) to fifty five (55) miles-Basic Wage Rate Coordinator at (971) 673-0839. <br /> rate plus $2.50 per hour. <br /> Zone 2: Fifty five (55) to one hundred (100) miles- Zone Rates <br /> Basic rate plus $3.50 per hour. <br /> Zone 3: Over. one hundred (100) miles-Basic rate Zone 2 2.50 <br /> plus $5.00 per hour. Zone 3 5.00 <br /> There shall be a maximum often (10) hours of For the Following Metropolitan Counties: <br /> zone pay per workday. <br /> Multnomah, Clackamas, Marion, Yamhill, Washington <br /> Reference Cities for Area 1: and Columbia: <br /> Boise, Idaho <br /> Twin Falls, Idaho See map on page 46 for Zone 1 of this classification <br /> Area 2 38.64 19.10. (A) All jobs or projects located in Multnomah, <br /> Clackamas and Marion counties, west of the <br /> Area 3 35.69 17.19 western boundary of Mt. Hood National Forest and <br /> west of mile post 30 on Interstate 84 and west of <br /> mile post 30 on State Hwy 26 and. west of mile <br /> post 30 on Hwy 22 and all jobs located in Yamhill <br /> County, Washington County and Columbia County <br /> shall receive Zone 1 pay for all classifications. <br /> II' ~ 1 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.