_ _ <br /> <br /> ~ 00706.47 Curing <br /> (ADD) The contractor shall cease applying slurry seal no later than 2:30-PM each work <br /> da to allow for curin .Slur seal a lication time ma onl be extended if <br /> Y 9 rY pp Y Y ~n <br /> the judgment of the Engineer the slurry seal will cure by 5:00-PM that da based <br /> Y <br /> on weather and tem erature conditions. <br /> p <br /> 00706.49 Cleanup <br /> (ADD) The contractor shall vacuum sweep the entire surface of all areas slurry sealed <br /> after the~slurry has cured and in accordance with the 00180.50. <br /> 00706.80 .Measurement , <br /> (DELETE) Crack sealing will be measured on the length basis, of material in-place. <br /> (ADD) The quantity of crack sealing will be measured on the weight basis in accordance <br /> with 00746.80. <br /> 00706.90 Payment <br /> Pay Item Unit of Measure <br /> (DELETE) (a) Slurry Seal Crack Sealing ...............................Foot <br /> (ADD) The accepted quantities of sealed cracks will be paid for at the Contract unit <br /> price, per pound for the item. "Slurry Seal Crack Seal" in accordance with <br /> 00746.90. <br /> Special Provisions -Job. #4592 Page 3 <br /> <br />