New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
GJN4592 Valley 2009-00022
COE
>
PW
>
Admin
>
Finance
>
Capital
>
2009
>
GJN4592 Valley 2009-00022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/19/2011 11:38:47 AM
Creation date
6/23/2009 9:44:15 AM
Metadata
Fields
Template:
PW_Capital
PW_Document_Type_Capital
Contracts
PW_Active
No
External_View
No
GJN
004592
GL_Project_Number
995444
Identification_Number
2009100409
COE_Contract_Number
2009-00022
Retention_Destruction_Date
10/26/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
No discharge into the City's stormwater system or related natural resources of construction <br /> related contaminants resulting from activities such as, but not limited to, concrete sawing, <br /> cleaning or washing of equipment, tools, or vehicles, shall occur. <br /> - Sediment Barriers <br /> Inlet protection shall be installed prior to any construction Work beginning and maintained <br /> during the entire project, as noted on the CSMP. <br /> Sediment Removal <br /> ' (1) Existing stormwater facilities shall be monitored during the contractor's construction <br /> activities. The Contractor shall, when directed by the Engineer, remove any sedimentation / <br /> debris, associated with their construction activities, that has been allowed to enter these existing <br /> stormwater facilities. <br /> (2)The Contractor shall remove any sedimentation /debris, associated with their construction <br /> activities, that--has accumulated in the sump, and lines of newly constructed stormwater facilities <br /> connected to the City's stormwater system, by the end of the Work day if construction is <br /> occurring during the wet season Work period (October 15 - Apri130) or when directed by the <br /> engineer. . <br /> Saw Cutting Slurry <br /> All-waste generated from saw cutting shall~be vacuumed immediately behind the saw cutting <br /> operation, and disposed of as approved by the engineer. <br /> Additional Best Management Practices <br /> 1. Sweep all streets in Work area nightly after Working in area.. <br /> 2. Patch all street cuts nightly. <br /> 3. Construction debris and garbage will be disposed of properly at the end of every Work <br /> day. <br /> 4. Concrete Work will occur in a manner such that no concrete is allowed to enter the city <br /> storm system, or natural resources. Concrete wash areas shall be constructed whenever <br /> <br /> ' possible, method of containment shall be straw bales lined with visqueen. <br /> Project Contacts: <br /> .City contacts for these projects shall be the project managers for the individual projects. <br /> Additional Contacts: <br /> Matthew Rodrigues Project Manager 541-682-6036 - <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.