New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
GJN4598 Wildish Contract 2009-00021
COE
>
PW
>
Admin
>
Finance
>
Capital
>
2009
>
GJN4598 Wildish Contract 2009-00021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/19/2011 11:47:02 AM
Creation date
6/19/2009 3:19:13 PM
Metadata
Fields
Template:
PW_Capital
PW_Document_Type_Capital
Contracts
PW_Active
No
External_View
No
GJN
004598
GL_Project_Number
995482
Identification_Number
2009100413
COE_Contract_Number
2009-00021
Retention_Destruction_Date
10/29/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> i <br /> Public Works <br /> z~ ~ Engineering <br /> ~ B:: ~ City of Eugene <br /> 99 East Broadway, Suite 400 <br /> Eugene, Oregon 97401 <br /> (541)682-5560 <br /> (541) 682-8410 FAX <br /> ADDENDUM N0.2 <br /> TO THE CONTRACT DOCUMENTS AND SPECIFICATIONS FOR <br /> EUGENE AHZPORT REHAB NORTH RAMP AT SOUTH HILO <br /> APRIL'13, 2009 JOB #4598 ~ BH) NUMBER 8 <br /> TO ALL PLANHOLDERS: <br /> The following changes shall amend and supplement the project bidding documents only to the extent specifically <br /> shown and noted: All other conditions shall remain the same. <br /> Bidders shall incorporate the effects of these changes in the appropriate bid items. included in this addendum and <br /> the total of these bid items then add in the appropriate place on the bid form. <br /> CHANGES TO' BID SCHEDULE: <br /> (DELETE) Original Bid Schedule-dated 03/19/2009. <br /> (ADD) Revised:Bid Schedule dated 04/13/2009 <br /> CHANGES TO CONTRACT FORMS <br /> (CHANGE) PUBLIC IMPROVEMENT CONTRACT FOR USE WITH FAA SPECIFICATIONS FOR <br /> CONSTRUCTION, SECTION 9.1 COMMERCIAL GENERAL LIABILITY. Change <br /> "$10,000,000" to."$5,000,000" [two instances]. <br /> CHANGES TO GENERAL PROVISIONS <br /> (DELETE). SECTION 70-13 OPENING SECTIONS OF THE WORK TO TRAFFIC. Delete two consecutive <br /> sentences that start "The project is not phased. Construction work shall start no earlier...." <br /> (ADD) SECTION 70-13 OPENING SECTIONS OF THE WORK TO TRAFFIC. Add the following to <br /> the clause after the first paragraph: "The project consists of three paving phases on the North <br /> Ramp. Each phase shall be completed and opened to traffic before the next phase starts. Phase.l <br /> consists of the reconstruction and paving at south Kilo and-the heavy pads. Phase 2 consists of the <br /> overlay work at the north end of the North Ramp near the site of the new Fire Station 12. Phase 3 <br /> consists of reconstructing Taxiway TNHT1-02. In addition, the project includes a large quantity <br /> of pavement marking; with completion requirements detailed in section P-620. <br /> Addendum #2 - Job.#4598 Page 1 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.