<br /> a4j17/2aa8 14:37 FAQ X41 682 841a CITY EUGENE Pw ENG ~ wILUISH CON3TRUC ~ aa2~aaD,,p <br /> Pu611c Works <br /> engineering <br /> tvity of Eugene <br /> 99 East Braadw&y, Buite 400 <br /> . Eugene, C1rggOn 97401 <br /> (541) $82-528"1 <br /> (54i) 682-8410 FA7C <br /> AY)DENia[JM NU. 3 <br /> TC) THE CUNTDACT bOCUMEN~'S AND SPECIFICATIONS FOIL <br /> EUGENE AIRPOI~')<' REHAB NORTH RANi>4' AT St)UTH I~iLO <br /> .4~I'RiL 17, X009 JC?$ #4595 $ZTy NUMBER 5 <br /> TO a?r•r.l?Y,ANHOLDERS: <br /> The following changes shall amend and supplement the project bidding documents only td tl~e extent specifically <br /> ' shown and noted. All other conditions shall retuain the same. <br /> Bidders shall, incorporate the effects of these changes in the appropriate bid items included in this addendum and <br /> the total ofthese bid items then add in the appropriate place on the bid farm. <br /> CHANGES TO TECHNYCAI. S1P'ECIFIC INS <br /> (ADD) ~'EM P <br /> 209 CRUSHED Af~fxRE~C,rATE BASE COURSE <br /> DESCRTFTIf~N. <br /> Z0~-1.1 This item consists of 3/~" - 0 aggrega~; base course per Section OU641 t~f the 200$ dragon Standard <br /> Specifications far Construction as amended by the City of Eugene, lVieasurement will be by the square yazd +~f <br /> base course placed, compacted, and accepted as shown on the plans. <br /> Payment wi11 be made under: <br /> Ytem Base Course 12" -per square yard <br /> Yf you have questions about this addendum or the project, please call,patrick Cox at (S41) b$~-6$54. <br /> AlI bidders shall acknowledge tl*e receipt of and acceptance of this Addendum No. 3 by sigt?ing and submitting the <br /> signed Addendum with the bid. Bids sulxmitted without this Addendum, or with the Addeaidurn net sigr?ed, will be <br /> GOI1Sld4~d Informal. <br /> 11+I Sclxoenir?ga .E. <br /> {City Engincer <br /> Receipt acknowledged and conditions agreed . <br /> this 17 day of APRIL , X009. <br /> Bidder WILDISH CONSTRUCTION CO. <br /> By: <br /> Addendum #3 =Job #E4598 Fage l <br /> <br />