New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
Admin Order 58-03-13-F (2)
COE
>
PW
>
Admin
>
Execs
>
Admin Orders
>
Admin Order 58-03-13-F (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/5/2009 9:33:47 AM
Creation date
6/4/2009 9:20:50 AM
Metadata
Fields
Template:
PW_Exec
PW_Division_Exec
Administration
PWA_Project_Area
Admin Orders
PW_Subject
Admin
Document_Date
8/4/2003
External_View
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
R-7.085/SL-D Design Standards Parameters and Materials. <br />1. Foundations shall meet AASHTO 90-mph wind load with 1.3 gust factors. <br />2. Unless otherwise approved as part of a land use permit, luminaires shall be at the IE5 <br />recommended cutail. <br />3. Average maintained illumination levels and average-to-minimum uniformityratio shall <br />be as recommended by IES, or as required by City staff. <br />4. Design parameters shall comply with the requirements of the current edition of the <br />City's Standard Specifications and Drawings Manual for construction as adopted and amended by <br />City Engineer memorandum. <br />5. The scales to be used are 1 "=20', 30', 40', or 50', and architectural scales will not be <br />accepted. <br />6. Plans shall showright-of--way lines, street centerlines, lot lines, cross streets enclosing <br />the area; curb lines, dimensions showing conduit location from curb line, dimensions showing location <br />ofcurb fromright-of--way lines, pavement edges, driveways, existing lights, proposedlights, proposed <br />service cabinets, proposed service points, wiring and conduit, EW~B box/vault numbers}, legends, <br />and all other work and material to be installed to provide a fully functional lighting installation. <br />7. Plan sheets shall include the following standard comments: <br />7.1 Construction shall conform to the current edition of the City's Standard <br />Specifications and Drawings Manual for construction as adopted and amended by City <br />Engineer memorandum. <br />7.2 The Electrical Contractor shall sign and obtain an Electrical Permit from the <br />Permit and Information Center prior to beginning any electrical work. <br />7.3 The Contractor shall not perform work without inspections. The Contractor <br />shall notify Public Works Engineering, 541-682-5560, at least 48 hours prior to work done. <br />Any materials or equipment installed without inspection and approval shall be cause for <br />rejection and removal. <br />7.4 The Contractor shall call Building & Permit Services, 541-682-5282 for <br />inspection of service equipment and associated branch circuits, including cabinets, <br />underground raceways (conduit systems) going to the controller and bonding for cabinets <br />before covering any work. <br />7.5 The owner/applicant is responsible for completing all work within the time <br />limits defined by the permit. <br />Administrative Order - 5 <br />C:\TEMP\03sflight2ao.wpd(07/30/03) <br />
The URL can be used to link to this page
Your browser does not support the video tag.