r <br />Attachment #1 of Exhibit A <br />Administrative .Order No. 58-96-06 <br />Page 1 of 3 <br />AMENDMENTS <br />TO <br />CITY OF EUGENE, ENGINEERING DIVISION, PUBLIC WORKS DEPARTMENT <br />SYSTEMS DEVELOPMENT CHARGE METHODOLOGIES. <br />EFFECTIVE, fEBRUARY, 1993 <br />ALL CHANGES WILL BE MADE, EFFECTIVE JULY 01, 1996. BASED ON THE ENGINEERING NEWS-RECORD PUBLICATION, THE CITY SDC FEES <br />REFLECT THE INCREASE IN CONSTRUCTION COSTS OF 2.15%. THE CHANGES ARE AS FOLLOWS: <br />ti. <br />1 Section 1.0 "The figures used in the appendices are those which <br />(¶ 4) appeared in the May 1991. adopted Methodologies. <br />They do not agree with the current fee schedule. The <br />1991 figures have been increased 2.8% in 1992, 3.7% <br />in 1993, 5.8% in 1994, and 2.65% in 1995." <br />PROPOSED ~effertwP date is 7u~y~01, 1996 <br />"The detailed analysis, figures, tables, and text. used in <br />-.the appendices are those which appeared in the May <br />1.991-adopted Methodologies. They do not agree with <br />the current fee schedule.. The 1991 detailed analysis., <br />figures:,: tables, and numeric references in the text,`have <br />been increa;;.ed 2.8% in 1992, 3.7% in 1993,5.8% in <br />1994,.2.65% )n.1995, and 2.15% in 1996." <br /> <br /> <br /> <br /> <br />~y <br />