R Unless otherwise approved, pavement cuts shall be made parallel or perpendicular <br />to the centerline of the public way. <br />9.' Trench backfill within the public way shall be compacted to a minimum of 95% <br />Relative Maximum Density as determined by gASHTO T99, method D as corrected <br />for oversize by AASHTO T-224. Compaction shall be accomplished using <br />mechanical vibrators or impact tampers. Wheel rolling by a truck or backhoe shall <br />not be acceptable_ <br />Within streets, alleys and sidewalks trench backfill shall consist of 3/4"-0 Crushed <br />Base Aggregate or, with prior approval, controlled density fill. Pea aravef shall not <br />be allowed as an option. <br />In trenches crossing a street or alley right-of--way at right angles to .the alignment, <br />cement-added aggregate with a minimum of 1 '/2 sacks of Portland cement per- <br />cubic yard or CDF may be used. Excavated materials shall not be allowed for use <br />as trench backfill except in unimproved portions of the public way. <br />Controlled density fill (CDF), also known as flowable backfiili, is a cementious <br />material mixed, transported, and delivered using normal ready mixed concrete <br />operations. ,.CDF is a mixture of cement, aggregates, water, and admixtures such <br />as fly ash proportioned to provide anon-segregating, self consolidating, free- <br />flowing .and excavatable material. CDF is a hardened, dense, non-settling fill that <br />requires no compaction effort. <br />Traffic may temporarily be placed, directly upon CDF prior to paving as soon as it <br />has sufficiently hardened so that the surface will withstand traffic or construction <br />equipment loading without deformation. If CDF is used as a temporary surf. ace <br />restoration material, the surface shall be maintained and repaired due to damage- <br />. by traffic. <br />alleys or sidewalks <br />10. All Portland cement concre#e used in the replacement of streets, <br />shall obtain a minimum breaking strength of 3,300 psi in 28 days: and conform to <br />sections 212 through 215 of the Standard Specifications. <br />11. All ornamental surfacing~shaH be replaced "in-kind" to that surfacing removed.. <br />12. Where sections of sidewalk are requested to be removed by the permittee, they <br />shall be removed to the nearest existing score or joint in each direction. <br />~ 3. Where sections of curb or curb and gutter are removed by the permittee, a <br />minimum of ten (10) linear feet of curb and gutter shall be removed and replaced. <br />An alternative to #his requirement shall be removing and replacing three (3) linear <br />feet of curb and gutter with the new curb and gutter tied into the existing curb by <br />inserting 6"X #4 rebar dowels into drilled one-half inch diameter by three (3) inch <br />deep holes in the adjoining exis#ing curbs and gutters, one dowel in the curb and <br />two dowels in the'gutter at each end of the replaced section. <br />18 12/09/97 <br />Utility & fZ/W Permit Policy <br />