', ~' required to respond to locate requests. after the project is completed but prior to.availability <br />of as-constructed drawings. <br />. t: <br />I, The inspection for any utility facilities relocation which was performed due to the City'c{ <br />~, contrac# construction project bu# which lies ou#side the limits of the construction probe <br />shall be the responsibility of the Utility lnspector_ <br />2.G.2 Privately Enaineered Public Improvement Proiects <br />Provisions for utility permits and inspection for City engineered and administered projects <br />shall apply to privately engineered public improvement projects with the exception that <br />Engineering Division personnel inspect only utility crossings installed. concurrent with <br />public improvements,inspected by the, Engineering inspector. All other.right-of-way permit <br />related inspection activities on such .projects will be performed by the Utility Inspector'. _ <br />~- <br />'; <br />~. <br />. _ f <br />;, <br />15 12/01/97 <br />Utility & ftIV1/ Permit Policy <br />