New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
Admin Order 58-97-21-F (2)
COE
>
PW
>
Admin
>
Execs
>
Admin Orders
>
Admin Order 58-97-21-F (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/5/2009 10:37:44 AM
Creation date
6/3/2009 8:08:14 AM
Metadata
Fields
Template:
PW_Exec
PW_Division_Exec
Administration
PWA_Project_Area
Admin Orders
PW_Subject
ROW
Document_Date
2/25/1997
External_View
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
85
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
permit being,revolced. <br />Revocable permits shall be subject to conditions approved by the City Engineer or <br />designee including, but not limited to all standards for temporary traffic control, <br />construction practices; and right-of way restoration included herein. EC 7.445(1) <br />2.C.1 Application <br />Application to use the public way under a revocable permit may be made to the staff of the <br />City Engineer at the Permit and lnformation Center at 99 West 10th Avenue_ <br />2.C.2 Plans and Drawings _ . <br />Due to the large vane#y of uses foc revocable permits, the plans and drawings to be <br />required for a permit will be addressed on a case-by-:case basis. Contact the staff of the <br />City Engineer for specific requirements. <br />2.C.3 Review <br />Engineering Division personnel have the responsibility of entering the permit information <br />: into a permit tracking system, routing the applications to the various reviewing divisions, ,_ <br />and.#hen issuing the permit:- if aright-of--way cut.permit is~required in addition to the <br />revocable permit, the right-of-way cut permit must:be reviewed .and approved, by the Utility . <br />Inspector prior to the issuance of the revocable permit. <br />The amount of time needed by the City: of EUgene to review a revocable permit varies <br />greatly depending upon the complexity of tf~e individual permit situation. . <br />A copy of all permits granted shat! be~forwarded #o the Utility Inspector in Maintenance <br />Planning #o aNow inspection of the right-of--way iestoration and temporary. traffic. control <br />measures used. <br />2.D STREET AND RIGHT-OF-WAY USE PERMITS, <br />2.D.1 .Application . <br />For EWEB, franchised utilities, and licensees, application to perform excavations within <br />the public way may be made to the Engineering Division at 858 Pear! Street. All other <br />right-ofi way use and cut permits are issued_through Engineering staff at the Permit and <br />lnformation Center at 99 W 10th Avenue. Applications shall be made on a. standard form <br />provided by the City. Ail relevant portions of application form and standard attachments <br />must be completed prior to submittal to the City. Incomplete applications will not be <br />processed and wiN be returned to applicant. <br />. Utility & R/UV Permit .Policy 9 12/01/97 <br />•. _ , _ _ _ <br />
The URL can be used to link to this page
Your browser does not support the video tag.