through use of the Oregon Utility Notification Center). <br />~_. <br />2. 'Identification of the types of activities and scope of work (length and diameter sizes <br />of service lines, etc.) requested to be allowed under the annual permit_ <br />3. A monthly report of all blanket permit activities and right-of way cuts will be <br />submitted, in an agreed-upon format, of each service installation or repair <br />performed by the permittee's staff or by contractors working for the permittee. <br />~~ <br />4. The name and telephone number of a specific. contact person who will be <br />responsible for responding to City concerns regarding the permittee's field activities. <br />The request for an annual. permit will be reviewed and approved, approved with <br />conditions; or denied. Annual permits are subject to revocation if a facility owner faits to <br />comply with the standards established by the City or conditions of the permit. <br />Permit fees for annual permits include a processing component and a "per_activity" <br />component. The permit processing component is payable upon approval of the annual <br />permit. The "per activity" component is calculated monthly~or periodically, based on the <br />number of activities performed under the annual permit for which a City response (e.g., <br />site review, inspection) was performed,; and billed to the permittee. <br />2.C REVOCABLE PERMITS. FOR PRIVATE FACILITIES <br />A revocable permit~may be issued to a permittee for any use of the public way which is not <br />administered by an existing franchise or license. As with aN right-of-way permits, the.City <br />reserves the. right to "revoke" or cancdl tf~e permittee's permission to use the public way at <br />a later date. This type of permit is typically used for placement of a private facility that <br />serves an individual property, 'site, or business and is not placed for the provision of <br />services to others. Detailed questions concerning revocable permits should be addressed <br />to the Engineering Division personnel. <br />Unless otherwise specified in a license or franchise agreement, a revocable permit shall <br />be obtained prior to the .placement of any private facility upon, over or under the public <br />way. The permittee shall be required to pay all permit fees and user fees as established. <br />Issuance of a revocable permit does not relieve the permittee from obtaining any <br />other permits which maybe required. Examples of other permits which may be <br />required are building, right-of-way cut, tree removal, and sewer connection. Any <br />revocable permit which entails excavation within the public way shall also require aright- <br />of-way cut permit. <br />Revocable permits issued which involve the placement ofi underground. facilities shall <br />(' <br />inform the permittee of the requirement for the permittee to subscribe to the Oregon Utility <br />Notification Center and to respond to requests from underground excavators.#or the field _ <br />location of the permittee's facilities. Failure to maintain this subscription may result iri the <br />Utility & RM/ Permit Policy 8, 92/01/97 <br />