New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
Admin Order 58-97-21-F (2)
COE
>
PW
>
Admin
>
Execs
>
Admin Orders
>
Admin Order 58-97-21-F (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/5/2009 10:37:44 AM
Creation date
6/3/2009 8:08:14 AM
Metadata
Fields
Template:
PW_Exec
PW_Division_Exec
Administration
PWA_Project_Area
Admin Orders
PW_Subject
ROW
Document_Date
2/25/1997
External_View
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
85
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
3.B.1 Portland Cement Concrete Streets, Alleys and Driveways <br />In addition to general requirements 1 through 20 given above, work wi#hin Portland Cement <br />Concrete (P.C.C.) streets and alleys shall conform to the following requirements: <br />1. .Minimum width of pavement cuts in P.C.C. streets and alleys shall be three {3) feet. <br />Unless otherwise approved, replacement of the full panels affected shall be required <br />on sidewalks and driveways. <br />2. P.C.C. in utility trench patches shall be placed to a depth matching the existing <br />pavement or seven (7) inches, whichever is greater. Where the existing pavement <br />is P.C.C. over Cement Treated Base (C.T.B.) or Asphalt Treated Base (A.T.B.), <br />replacement depth shall be the combined depth of the P.C.C. and C.T.B. or A.T.B. <br />3. Where the replacement P.C.C. on the outside edge of an alley abuts A.C. a <br />minimum of 24 inches of A.C. shall be removed to allow sufficient room for the <br />placement of the alley concrete forms and proper compaction of asphalt restoration. <br />Where the alley outside edge abutting material is P.C.C., a full length expansion <br />.joint shall be placed. <br />4. Steel reinforcement which is required to be used in all P.C.C. street, alley and <br />driveway utility trench patches shall be No. 4 bar twenty-four (24) inches on center <br />in both the longitudinal and traverse directions. A minimum of two parallel bars in <br />each direction shall be used. Except at existing expansion joints, the new patch <br />shall be tied into the existing pavemen# by fully inserting the reinforced steel into <br />drilled half inch diameter by three {3) inch deep holes in the adjoining existing <br />pavement. Splices in the reinforced steel required to be made shall have an overlap <br />of at least twelve (12) inches. <br />5. Utility trenches patched with P.C.C. shall be kept free of traffic or other detrimental <br />trespass through use of suitable barriers and other traffic control devices for a <br />minimum period of seven (7) days. An alternative using 9.0 sacks of portland <br />cement per cubic yard of concrete allows the traffic to be returned after a minimum <br />period of (3) days. <br />6. Pavement cuts encountering P.C.C. overlaid by asphalt concrete may be replaced <br />by full depth asphalt concrete. <br />7. Internal vibration shall be used to consolidate P.C.C. which is being placed in <br />depths greater than seven (7) inches. <br />3.B.2 Asphalt Cement Concrete Streets <br />In addition to general requirements 1 through 20 given in section 3.B above, work within <br />Asphalt Cement Concrete (A.C.) streets and alleys shall conform to the following <br />requirements: <br />Utility & R/W Permit Policy 20 02/09/98 <br />
The URL can be used to link to this page
Your browser does not support the video tag.