. EXHIBIT A (page- 6 of.6) <br />2.0 Adopted SDC Fee Schedule: Current Rates <br />2.9 Transportation System <br />Cost per trip- -------------------------------------------- $665.49 ', .__ <br />2.2 Local Wastewater System: <br />Equivalent Single-family dwelling unit (EDU) .... . . . . . . . ........... $560.58 <br />Per Plumbing Fixture Unit (PFU) [ 560.58 / 16 ] ... . ....... . . . .... $35.04 <br />For Historic Consumption, per 1,000 gallons <br />of average monthly winter water consumption [ $560.58 / 6 ] ....... _ $93.42 <br />River Road/San#a Clara/ Highway 99 Areas: <br />Per square foot of tax lot area ........ . ........ . . . ........... $0.025 <br />2.3 Regional Wastewater System: <br />Unit Cost by Component: <br />Average Flow (per gallon) ........ . <br />.....-• .................. 0.317 <br />Peak Wet Weather Fiow (per gallon) .................. . ....... $0.745 <br />Biochemical Oxygen Demand (per pound)) .......... . ... . . .... $202.94 <br />Suspended Solids (per pound)) ............................. $9 57.53 <br />2.4 Stormwater System: <br />Per Single Family Dwelling: <br />With building footprint < 3,000 sq.: ft . .......................... $475.74 <br />{Assumes 9,200 sq ft lot; .35 impervious surface) <br />[ 9,200 x 0.35 = 3,200 x 0.148 = $476.00] - <br />With building footprint 23,000 sq. ft. or more ............. . ..... $713.61 <br />(Assumes 1.5 x SFD average impervious surface) <br />[ $475.74 x 1.5 ] <br />Per Duplex (equals two Dwelling Units) .......~ :.................... $951.48 <br />Per Manufactured Home Development: <br />Per space in the development ............................... $249.23 <br />(Assumes 1,684 sq. ft. perspace x $0."!48) <br />plus per square foot of impervious area. for:other features .......... $0.148 <br />All Other Development: <br />Per square foot of imperviouslequivalent impervious area. ......... $0.148 <br />2.5 Parks System: <br />Total charge per person ...::....:....................... . . . $362.36 <br />Total charge per Dwelling Unit {2.3 persons x $362.36) .. _ .... _ .... $833.43 <br />2.6 Adminis#ration Fees: <br />City of Eugene per total SDC charges . . ....................... 5.0% <br />{Based on the gross SDC charge) <br />MWMC per permit application .. . .............. . .... . ......... $10.00 <br />2.7 Appeal Fee: <br />Cify of Eugene per SDC appeal .:............................ $100.00 <br />City of Eugene SDC t1llethodoiogy Page G-6 <br />