New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
Admin Order 58-98-10-F (2)
COE
>
PW
>
Admin
>
Execs
>
Admin Orders
>
Admin Order 58-98-10-F (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/5/2009 10:38:53 AM
Creation date
6/2/2009 9:11:51 AM
Metadata
Fields
Template:
PW_Exec
PW_Division_Exec
Administration
PWA_Project_Area
Admin Orders
PW_Subject
SDC
Document_Date
5/19/1998
External_View
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
EXHI[3IT A page 5 of 6) <br />~~ ~ <br />Existing and increased plant Local Equity . <br />related to biochemical oxygen demand Cost per pound of <br />biochemical oxygen demand <br />Design biochemical oxygen demand <br />Existing.. grid increased plant Local Equity <br />related to total suspended solids Cost per pound <br />_ of suspended solids <br />Design suspended solids <br />Calculations: <br />$15,509,000 <br />_ ' $0.31;7 (per:galion of average daily flow) <br />49, 000; 000 <br />$30,31.3,000'+$6,170,000 <br />_ $0.745 (per gallon of average daily peak flow) i <br />49, 000, 000 <br />$13, 394, 000 <br />_ $202.94 lper'poundlof biochemical oxygen demand) <br />':.66,000 <br />$1..1,279,000 <br />_ $"i 57.53 (per pound of suspended solids). <br />71,600 <br />7.4 Stormwater System Cost of Service: <br />Formulas: <br />SDC eligible costs <br />Cost per impervious acre <br />Acres of impervious surface <br />Cost per impervious acre <br />Cost per square: foot of impervious surface <br />Square feet per acre <br />City of Eugene SDC tltlethodology Page G-4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.