Transportation -Unfunded Program <br /> Priority Sidewalk Installation Projects Install new sidewalks based on the sidewalk priority rating system in the adopted City <br /> i of Eugene Sidewalk Program. This figure represents the unfunded need for the six-year <br /> - CIP period. <br /> Plan/Policy Document: TransPlan Policy, TRIP, City Sidewalk Program <br /> l <br /> Total Project Cost: $2,700,000 <br /> i <br /> Railroad Crossing Upgrade Program Replace deteriorated railroad crossings with high quality new materials to improve the <br /> ~ road surface. <br /> Plan/Policy Document: TransPlan <br /> Total Project Cost: $300,000 <br /> I <br /> Stewart Rd (Bailey Hill to Bertelsen) Upgrade to 2 lane urban facility. <br /> i Plan/Policy Document: TransPlan <br /> Total Project Cost: $550,000 <br /> i <br /> Van Duyn, Harlow to Western Upgrade to a 2 lane urban facility <br /> Plan/Policy Document: TransPlan, Willakenzie Area Plan <br /> Total Project Cost: $375,000 <br /> Willow Creek Road (18th - S. City Limit) Upgrade to a 2 to 3 lane urban facility. <br /> Plan/Policy Document: TransPlan, West Eugene Wetland Plan <br /> Total Project Cost: $1,590,000 <br /> i <br /> New Capital Facilities <br /> )essen Street Path Construct a two mile path along the )essen Street alignment (A2 channel alignment) <br /> from Ohio Street to the Beltline path. Path will be 12 feet wide, concrete, and lighted. <br /> Plan/Policy Document: Bikeways Master Plan <br /> i <br /> Total Project Cost: $1,172,000 <br /> <br /> lI <br /> i <br /> City of Eugene • 2000-2005 Capital Improvement Program <br /> Project and Program Areas -Transportation <br /> _ _ <br /> <br />