<br /> Transportation -Unfunded Program Transportation -Unfunded Program <br /> System Preservation & Maintenance Preserve and maintain the investment in existing improved streets, alleys, traffic <br /> controls and other transportation facilities City-wide, including overlays and minor <br /> Table of Unfunded Projects reconstruction projects for roadways deteriorated to a point where operating resources <br /> (Figures in $toaa~s) for preventative maintenance are not cost-effective. This figure represents the <br /> unfunded need for the six-year CIP period. <br /> PreservationlMaintenance PIanlPolicy Document: TransPlan Polity, Pavement Management System, Eugene <br /> Bike Path Rehabilitation 390 Infrastructure Finance Study <br /> System Preservation & Maintenance 10,800 Total Project Cost: $10,800,000 <br /> Upgrades and Capacity Enhancement <br /> 28thl29th Avenues (Madison -Willamette) 951 Uuarades and CaaacitV Enhancement <br /> Agate Street (30th -Black Oak) 585 28th(29th Avenues (Madison • Willamette) Widen to 5 lanes, including bike lanes, from Lincoln to Willamette. Consider <br />installing <br /> Amazon Parkway (19th - 24th) 690 sidewalks along missing portions of the facility. <br /> Bethel Drive (Roosevelt- Hwy 99) 2,500 PlanlPolicy Document: TransPlan <br /> Crest Drive (Lincoln • Storey) 630 Total Project Cost: $951,000 <br /> Division Road (Division PI • River Ave) 1,720 <br /> Elmira Road (Hwy 99-Bertelsen) 1,815 Agate Street (30th • Black Oak) Upgrade to a 2 lane urban facility. <br /> Friendly Street (28th -Lorane) 480 <br /> Jeppesen Acres (Gilham -Providence) 525 PIan/Policy Document: TransPlan <br /> Maple Street (Roosevelt- Elmira) 210 Total Project Cost: $585,000 <br /> Neighborhood Traffic Calming 600 <br /> Old Coburg Rd (Chad to N. Game Farm) 525 Amazon Parkway (19th - 24th) Widen with one additional lane for southbound traffic between 19th & 24th streets <br />to <br /> Priority Sidewalk Installation Projects 2700 address congestion/safety problems on Pearl between 16th & 19th. Modify the <br /> 300 intersection at 24th to provide for east and west left turn lanes. <br /> Railroad Crossing Upgrade Program <br /> Sidewalk Access Ramps 300 PlanlPolicy Documertt: TransPlan, CATS <br /> Stewart Rd (Bailey Hill to Bertelsen) 550 Total Prajed Cost: $690,000 <br /> Storey Blvd (Lorane-S. City Limit) 1,035 <br /> Street Lighting (ResidentiaU 600 Bethel Drive (Roosevelt- Hwy 99) Upgrade to a 2 lane urban facility... <br /> Street Tree Stocking & Planting Program 180 <br /> PlanlPolicy Document: TransPlan <br /> Willow Creek Road (18th • S. City Limit) 1,590 <br /> Total Project Cost: $2,500,000 <br /> New Capital Facilities - <br /> Jessen Street Path 1,172 Crest Drive (Lincoln-Storey) Upgrade to a 2 lane urban facility. <br /> Terry Street (SP Railroad-Roosevelt) 0 <br /> PIanlPolicy Document: TransPlan <br /> Total $30,848 <br /> Total Project Cost: $630,000 <br /> Division Road (Division PI -River Ave) Upgrade to a 2 to 3 lane urban facility. <br /> Description of Unfunded Projects PIanlPorcy Document: TransPlan <br /> PreservationlMaintenance Total Project Cost: $1,720,000 <br /> Bike Path Rehabilitation Preserve and maintain existing 28 miles of bike paths, This represents the unfunded <br /> need for the six-year CIP period. Elmira Road (Hwy 99•Bertelsen) Upgrade to a 2 lane urban facility. <br /> PlanlPolicy Document: PIanlPolicy Document: TransPlan, Bethel-Danebo Refinement Plan, Bicycle <br /> Total Project Cost: $390,000 Master Plan <br /> Total Project Cost: $1,815,000 <br /> City of Eugene • 2000-2005 Capital Improvement Program City of Eugene • 2000-2005 Capital.lmprovement Program <br /> Project and Program Areas -Transportation Project and Program Areas.- Transportation <br /> 49 50 <br /> <br />