<br /> Transportation -Six-Year Funded Program Transportation -Six-Year Funded Program <br /> Royal Avenue Qerry - Greenhilq Upgrade to a 2 lane urban facility. New Capita) FdCllitjes <br /> PlanlPolicy Document: TransPlan, Bethel-Danebo Refinement Plan E. Bank Path Osland Estates-Greenway) Construct a bicycle and pedestrian path along the east <br />bank of the Willamette River <br /> between River Island Estates and the Greenway Bridge. <br /> Total Project Cost: $2,b80,000 PIanlPolicy Document: TransPlan, Bicycle Master Plan, Willakenzie Refinement <br /> Plan, Parks Master Plan <br /> Total Project Cost: $1,481,000 <br /> Street & Sidewalk Improvements Non-assessable share of petitioned and City-initiated street, sidewalk and stormwater <br /> and wastewater channel improvement projects. This funding is distinguishable from <br /> SDC's which are used primarily far needed non-assessable infrastructure capacity to <br /> support growth in the community. Fern Ridge Path Qerry to Greenhilp Extend Fern Ridge Path from Terry Street to Greenhill Funding is a combination of <br /> PIanlPolicy Document: City Code, TransPlan Polity, Storm Sewer Master Plan, federal TEA-21 funds, enhancement funds, and City SDC funds. <br /> Sanitary Sewer Master Plan Plan/Policy Document: <br /> Total Project Cost: $480,000 Total Project Cost: $2,612,000 <br /> Street Lighting (Arterials) Install new or upgraded street lights along major streets based on priority needs. 1-105 Soundwall* Construct soundwall on the <br />north side of I-105 between I-5 and Coburg Road. (These <br /> figures represent the property owner and City shares only. Contributions from Lane <br /> PIan/Policy Document: TransPlan County and ODOT are to be budgeted in separate processes). <br /> Total Project Cost: $450,000 Plan/Policy Document: <br /> Total Project Cost: $300,000 <br /> Traffic Operations Improvement Program lanes and bicyc eolaaesnmed an slandgesafety devices, and other) restr p ng and um <br /> channelization modifications. Riverfront Park Interior Streets & Paths ConstrucCinteriorsueet and bicycle and pedestrian path projects within the Riverfront <br /> Research Park. Development within the Park will determine project priorities for <br /> Plan(Policy Document: TransPlan Policy, Bicycle Master Plan necessary infrastructure improvements. <br /> Total Project Cost: $360,000 PIanlPolicy Document: Riverfront Research Park Master Plan <br /> Total Project Cost: $800,000. <br /> Traffic Signal Installations Install new traffic signals and upgrade the traffic signal system to improve <br /> responsiveness, reduce delay, improve air quality, and facilitate multi-modal traffic <br /> flow. Locations for installing new traffic signals are based on a priority rating system Services far New Development Unspecified petitioned infrastructure improvements <br />to support new development and <br /> that considers traffic volumes, delays, accidents, standard signal warrants and other respond to infrastructure needs in developing areas ftypically transportation <br /> traffic and development-dependent factors. improvement projects that may include wastewater and stormwater system <br /> Plan/Policy Document: Traffic Signal Priority List, TransPlan t components). <br /> PlanfPolicy Document: SDC City Code & Methodologies <br /> Total Project Cost: $1,200,000 <br /> Total Project Cost: $11,940,000 <br /> Willamette Street,llth to 13th Add street trees and islands for beautification project. Funding comes from Tree <br /> Replacement fees allocated to the Road Fund. <br /> PIanlPolicy Document: Downtown Plan <br /> Total Project Cost: $24,000 <br /> r <br /> fr <br /> f <br /> City of Eugene • 2000-2005 Capital Improvement Program k City of Eugene • 2000.2005 Capital Improvement Program <br /> Project and Program Areas -Transportation Project and program Areas -:Transportation <br /> 47 ~ 48 <br /> <br />