<br /> Transportation -Unfunded Program Transportation -Unfunded Program <br /> Friendly Street (26th -Lorane) Upgrade to a 2 lane urban facility. Stewart Rd (Bailey Hill to Bertelsen) Upgrade to 2 lane urban facility. <br /> PIan/Policy Document: TransPlan Plan(Policy Document: TransPlan <br /> Total Project Cost: $480,000 Total Project Cost: $550,000 <br /> Jeppesen Acres (Gilham • Providence) Upgrade to a 2 lane urban facility. Storey Blvd (Lorane - S. City Limit) Upgrade to a 2 lane urban facility. <br /> PIanlPolicy Document: TransPlan PIanlPolicy Document: TransPlan <br /> Total Project Cost: $525,000 Total Project Cost: $1,035,000 <br /> Maple Street (Roosevelt- Elmira) Upgrade to a 2 lane urban facility. - Street Lighting (Residential) Install new or upgraded street lights along local streets <br />and in residential areas. <br /> Locations are based on a priority system that incorporates crime activity, lighting <br /> Plan/Policy Document: TransPlan, Bethel-Danebo Refinement Plan needs; location and the availability of power. This figure represents the unfunded <br />need <br /> Total Project Cost: $210,000 for the six-year CIP period. <br /> PIanlPolicy Document: Street Light Priority List, TransPlan <br /> Neighborhood Traffic Calming Neighborhood traffic calming projects, including speed humps, diverters, chokers, Total Project Cast: $600,000 <br /> circles, and other street enhancements. Program addresses neighborhood traffic <br /> problems which are prioritized with the assistance of neighborhood organizations. <br /> This figure represents the unfunded need for the six-year CIP period. Street Tree Stocking & Plartting Program Plant street trees in City areas needing new <br />trees and where street trees were removed <br /> due to damage or disease. <br /> PIanlPolicy Document: TransPlan <br /> PIanlPolicy Document: TransPlan Policy, Street Tree Program, Urban Forest <br /> Total Project Cost: $600,000 Management Plan <br /> Total Project Cost: $180,000 <br /> Old Coburg Rd (Chad to N. Came Farm) Upgrade to a 3 lane urban facility. <br /> PIarJPolicy Document: TransPlan, Willakenzie Area Plan Willow Creek Road (18th • S. City Limit) Upgrade to a 2 to 3 lane urban facility. <br /> Total Project Cost: 8525,000 PIanlPolicy Document: TransPlan, West Eugene Wetland Plan <br /> Total Project Cast: $1,590,000 <br /> Priority Sidewalk Installation Projects Install new sidewalks based on the sidewalk priority rating system in the adopted City <br /> of Eugene Sidewalk Program. This figure represents the unfunded need for the six-year <br /> cIP period. New t;aaital Facilities <br /> PlanlPolicy Document: TransPlan Policy, TRIP, City Sidewalk Program <br /> Jessen Street Path Construct a two mile path along the Jessen Street alignment (A2 channel alignment) <br /> Total Project Cost: $3,700,000 from Ohio Street to the Beltline path. Path will be 12 feet wide, concrete, and lighted. <br /> PlanlPolicy Document: Bikeways Master Plan <br /> Railroad Crossing Upgrade Program Replace deteriorated railroad crossings with high quality new materials to improve the Total Project Cost: $1,172,000 <br /> road surface. <br /> PIan/Policy Document: TransPlan Terry Street (SP Railroad - Roosevek) Construct a 3-lane urban facility, including bike lanes, sidewalks, curb, gutter <br />and <br /> Total Project Cost: $300,000 stormwater facility. The alignment of Terry Street has been shifted from its current <br /> north/south alignment to connect to the West Eugene Parkway. The West Eugene <br /> Parkway project will construct the portion of Terry from the Parkway to Morely Loop <br /> Sidewalk Access Ramps Install sidewalk access ramps at intersection corners and other needed access locations The project will extend Terry Street from Morely <br />to Roosevelt. <br /> throughout the City, including the installation of new ramps and reconstruction of PIanlPolicy Document: TransPlan <br /> existing ramps to comply with ADA and City standards. This figure represents the <br /> unfunded need for the six-year CIP period. Total Project Cost: $0 <br /> PIarJPolicy Document: TransPlan Policy, ADA Regulations <br /> Total Project Cost: $300,000 <br /> City of Eugene • 2000-2005 Capital Improvement Program City of Eugene • 2000-2005 Capital Improvement Program <br /> Project and Program Areas -Transportation Project and Program Areas -Transportation <br /> 51 52 <br /> <br />