<br /> Transportation -Six-Year Funded Program Transportation -Six-Year Funded Program <br /> Traffic Signal System Preservation Preserve existing traffic signal systems including detection, signal controllers and other <br /> <br /> Table of Funded Projects hardware. <br /> (Figures in $1000's) <br /> PIanlPolicy Document: TransPlan Policy <br /> FY00 FY01 fY02 FY03 FY04 FY05 Total <br /> Total Project Cost: $240,000 <br /> PreservationlMaintenance <br /> Street & Alley Preservation 460 460 460 460 460 460 2760 <br /> Traffic Signal System Preservation 40 40 40 40 40 40 240 <br /> 500 500 500 500 500 500 3000 Ua;;rades and Caaacity Enhancement <br /> Upgrades and CapaClty Enhancement Amtrak Station Improvements Acquire and improve Amtrak Station using $2.0 million federal TEA-21 funds and $0.5 <br /> Amtrak Station Improvements 2500 2500 million Amtrak funds. <br /> Bertelsen Road (18th -Bailey Hill) 1035 1035 PIanlPolicy Document: TransPlan <br /> Dillard Road (43rd • Garnet) 450 450 <br /> Total Project Cost: $2,500,000 <br /> Fox Hollow Rd (Mahalo-S. City Limit) 841 841 <br /> Goodpasture Island Road (Delta- Happy) 413 413 <br /> On-Street Parking Improvements g0 50 80 50 50 90 410 Bertelsen Road (18th • Bailey Hill) Upgrade to a 2 to 3 lane urban facility. <br /> Royal Avenue (ferry-Greenhilp 2680 2680 <br /> PlanlPolicy Document: TransPlan <br /> Street & Sidewalk Improvements 80 80 80 80 80 80 480 <br /> Street Lighting (Arterials) 75 75 75 75 75 75 450 Total Project Cost: $1,035,000 <br /> Traffic Operations Improvement Program 60 60 60 60 60 60 360 <br /> Traffic Signal Installations 200 200 200 200 200 200 1200 Dillard Road (43rd -Garnet) Upgrade to a 2 to 3 lane urban facility. <br /> Willamette Street, l tth to 13th 24 24 <br /> 3442 1306 3175 1500 915 505 10843 PlanlPolicy Documentt: TransPlan <br /> New Capital Facilities Total Project Cost: $a5o,oo0 <br /> E. Bank Path (Island Estates-Greenway) 1481 1481 <br /> Fern Ridge Path (Terry to Greenhill) 2612 2612 <br /> Fox Hollow Rd (Mahalo-S. C'dy Limk) Upgrade to a 2 lane urban facility, including bike lanes and sidewalks on one side, <br /> I-105 Soundwall' 300 300 <br /> 800 consistent with existing section. <br /> Riverfront Park Interior Streets & Paths 400 400 <br /> Services for New Development 1 ggQ 1990 1990 1990 1990 1990 11940 PIanlPolicy Document: TransPlan, CIP <br /> 6783 2390 1990 1990 1990 1990 17133 Total Project Cost: $8at,o00 <br /> tTotal 10725 4196 5.665 3990 3405 2995 30976 <br /> Goodpasture Island Road (Delta -Happy) Improve roadway and shoulders for bicyclists and pedestrians. Project scope and cost <br /> to be adjusted depending on project feasibility and phasing plan. <br /> tThese totals are not fund-specific and include all programmed funds. for information about specific funds and detailed project funding for PIanlPolicy Document: <br /> TransPlan <br /> FY2000 and FY2001, refer to the Two Year Fund Detail on the previous page(s6 <br /> Total Project Cost: $413,000 <br /> Description of Funded Projects <br /> PreservationlMaintenance On-Street Parking Improvements Upgrade parking areas within the public right-of-way, including upgrading meter <br /> clocks, maintaining meter supplies, and painting designated parking areas. <br /> Street & Alley Preservation Preserve existing improved streets and alleys City-wide, through overlays and minor <br /> reconstruction projects for roadways deteriorated to a point where operating resources PIanlPolicy Documertt: TransPlan <br /> for preventative maintenance are not cost-effective. <br /> Total Project Cost: $41D,000 <br /> PlanlPolicy Document: TransPlan Policy, Pavement Management Program <br /> Total Project Cost: $2,760,000 <br /> j <br /> 's <br /> 4 <br /> City of Eugene • 2000.2005 Capital Improvement Program + City of Eugene • 2000.2005 Capital Improvement Program <br /> Project and Program Areas -Transportation Project and. Program Areas -Transportation <br /> 45 46 <br /> i <br /> 1. <br /> <br />