New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
2003-07 EWEB CIP Draft
COE
>
PW
>
Admin
>
Execs
>
Executive non-confidential
>
Historical
>
2003-07 EWEB CIP Draft
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/8/2009 12:30:48 PM
Creation date
6/1/2009 12:30:45 PM
Metadata
Fields
Template:
PW_Exec
PW_Division_Exec
Administration
PWA_Project_Area
Miscellaneous
PW_Subject
EWEB CIP
Document_Date
9/30/2002
External_View
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Water Production Additions & Improvements -Project No. 14270 <br />Capital projects for Water Production Additions and Improvements are derived from both the <br />Water Supply. Plan and Facilities Planning efforts. The Water Supply Plan promulgated the <br />Hayden Bridge Expansion Study, which was completed Summer of 1999. The expansion study <br />recommendations and costs are included in the Supply Plan Section of the CIP. <br />In conjunction with the Hayden Bridge Expansion Plan, EWEB also conducted a seismic study <br />of the existing plant to evaluate the structural integrity of the plant. This study provided an <br />estimate of useful life remaining (50 years) of the treatment plant, and recommend upgrades in <br />areas that will be included in the 5-year capital plan. <br />1 reatment Ylant <br />Additions 2003 2004 Inns 2nn~ ~nn~ ~nnz ~nn~ ~nnn .,,,,.. <br />Filter Rebuild <br />Pro ram <br />N-5 Filter Rebuild $220,000 $220,000 <br />S-4 Filter Rebuild $200,000 1,400,000 <br />S-5 Filter Rebuild $200,000 $200 000 <br />S-6 Filter Rebuild $200,000 $200,000 <br />Hayden Bridge <br />S stem U rades <br />Seismic U grades $145,000 $145,000 <br />UV Disinfection <br />S stem <br />$200,000 <br />$1,898,000 <br />$2,098,000 <br />South Bank Filter <br />Structural U ade <br />73,000 <br />$518,000 <br />$591,000 <br />HB Mechanical <br />Evaluation <br />$72,600 <br />$72,600 <br />HB Emergency <br />Generator <br />$140,000 <br />$.140,000 <br />HB Alum Tank <br />U ades <br />$44,300 <br />$44,300 <br />Total Production $549,900 $1,263,000 $ 0 $200,000 $1,898,000 $5,110,900 $ 0 <br />Project Descriptions: <br />Filter Rebuilds <br />Hayden Bridge is currently rebuilding the existing twelve filter beds constructed in the 1950s and 1970s. <br />Occasionally, existing under drain plates will break, causing filter media to be displaced. Other filter beds were <br />rebuilt in the late 1970s. The rebuilds consist of removing old filter media and under drains, repainting the <br />walls, constructing and installing efficient under drain-systems, and replacing the media. <br />Water Division -Five-Year Capital Improvement Plan <br />7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.